Friday, January 24, 2020

Hamlet: The Man behind the Madness Essay -- ophelia, shakespeare

What drives Hamlet to his madness? How does it relate to Ophelia’s madness? Are Hamlet and Ophelia both truly mad? These are some questions that I contemplated as I read Hamlet. The main character, Hamlet feigns madness after learning of his father’s murder; however, he becomes mad later on in the play. Is it possible that Hamlet became so wrapped up in his father’s murder that he was unable to distinguish fantasy from reality? At the beginning of the play, Hamlet has learned that his brother, the newly king, Claudius, murdered his father. In Christian Wertenbaker: What is the riddle in HAMLET? (Sirs.com, 2011) it is stated, â€Å"From then on, Hamlet has to find his own way. He has become a seeker of truth. Unless he verifies the facts for himself, he cannot do the act† (1). This shows that Hamlet can’t back away from what he is meant to do. In his eyes he sees himself as being chosen to avenge his father. In fact, Hamlet proclaims, â€Å"The time is out of joint. O, cursed sprit, That ever I was born to set it right† (I. V. 207-208)! Already Hamlet is stressed out by his misfortune. He sees no other option, but to kill his uncle. After his meeting with the ghost, Hamlet becomes obsessed with death. It is obvious that Hamlet is wrestling with the idea of whether or not he can commit the act. At this point he is capable of reasoning, but prior to this he was wily enough to invent his false madness. He has not lost his ability to discriminate right from wrong; therefore, he is not mad. To be mad a person loses total reasoning. Still he is determined to discover whether or not Claudius did really murder his father. So, Hamlet organizes a play that reveals the truth about his father’s death. This play serves as a strategy to force Claudi... ...f action have been eaten up by thought, he to whom the universe seems infinite, and himself nothing; whose bitterness [75] of soul makes him careless of consequences, and who goes to a play as his best resource is to shove off, to a second remove, the evils of life by a mock representation of them - this is the true Hamlet† (2). To me this means that Hamlet is what the audience or reader makes him to be. He is not mad, but a part of everyone. He is seen in the audience. This play contains a truth, the truth of life. Hamlet’s character contains many feelings that are shared such as sorrow, dread, and lonely. For Hamlet’s character lives through the reader. Works Cited Shakespeare, William. â€Å"The Tragedy of Hamlet, Prince of Denmark† Literature: An Introduction to Reading and Writing. Ed. Edgar V. Roberts. 9th Ed. New York: Pearson Longman, 2009. Print

Thursday, January 16, 2020

Project Report Cow Dairy

|Area Considered 27500 Sft. |Scope of work | |   |Civil and Interior Work | |1 |Dismantling of existing flooring | |2 |Brick work | |3 |Providing and laying brick wall with plaster finished with POP punning and including | | |plastic emulsion paint | |4 |Vitrified flooring in 2nd floor entrance lobby and 1st floor passage, waiting area, | | |reception area and cafeteria. | |5 |Vitrified tile flooring in toilet and vitrified tile dado in toilet and pantry. | |6 |Fire alarm systems with sprinklers. | |7 |Kota in store room. | |8 |Raised floor in Electrical room, UPS and server room | |9 |Granite toilet counter | |10 |Dry pantry counter in cafeteria. |11 |100mm & 75mm thick full height partition finished with plastic emulsion paint | |12 |Full height glass partition in main entrance lobby, conference room & meeting room. | |13 |Gypsum ceiling & acoustic ceiling | |14 |Doors: 12mm toughned glass with ozone make hardware and 38mm laminate finish flush door | | |with ozone fittings. | |15 |Built in furniture: Full height storage made out of commercial ply with 1mm thick | | |laminated shutter, overhead storage made of commercial ply with laminate finish. | |16 |Loose Furniture: Reception table with corian top and laminate on inside with pedestal | | |unit. | |17 |16 seaters and 10 seaters meeting room table with laminate finish. |18 |Security table | |   |Electrical work | |   | Design, fabrication,supply and installation of main LT panel board, capacitor control | | |panel, lighting distribution board, power distribution board, UPS distribution board, | | |power cabling, control cabling, wiring in conduits, lilghting with lighting fixtures and | | |appliances. Cabling, telephone cabling, Floor trunking and cable tray. | |   |HVAC | |   | Ductable 50 tones split AC with grills and defusers and duct insulations with electrical | | |cabling. |   |Carpet | |   | Rest of the floor will be carpet flooring. | |   |Blinds | |   |Blinds in external wind ows | |   |Signage: | | | Signage’s in toilet. Meeting room, fire fighting staircase etc. | |   |Network Cabling | |   | 2 data and 2 voice point in each work station and 4 data and 4 voice point in each | | |conference and meeting room. |   |UPS | | |Required capacity of UPS battery with racks. | |   |AV Equipment-LCD/Projecter, | | |Polycom Phones | |   |LCD in conference room and cafeteria, polycom phone in conference room. | |   |Furniture | | |65 Linear work station in laminate finish. | |   |All Chairs (Except work station chair and meeting room chairs )in cafeteria and sofa for | | |reception. |   |Office Equipments | |   |Office Equipments: 230 Ltrs Refrigerators, door mate and steel dustbin. | – Required Scope of services : 1. Design Services:- Interior design of office fit out covering space planning , interior layout , furniture fixtures , false ceiling  (with minimum modifications possible), partition , carpentry etc. Prepare and p resent final design development plans and details, fixing dimensions and describing in details the interiors , mechanical , electrical ,  Ã‚  IT,   AV and lighting solution. 2. Fit -out Management:-   Project Management of the fit-out works including submission of design to handing over of facility . 3.MEP Consultant :- Design of all services like UPS , Electrical ,   HVAC , IT Network , Security system & AV equipment . 4. Fit out work :- Providing , Supplying & Installation of Civil interiors , Electrical , HVAC , Modular furniture's , Chairs (excluding workstation and meeting room chairs) , Carpet , Blinds , AV equipment , UPS , IT networks , Signage's/Graphics & Office equipment  as per approved design. for spaces including (but not limited to) Workstation Area, Reception Area, Server Room, UPS Room, Meeting Rooms,  Cafeteria, Dry Pantry, Quite Rooms, Reprographics cum Stationary Area, Store Room, Electrical Room etc. Please refer the attached scope of works (specific ations and Proposed Plan) for  Ã‚  further details  . |S. No. SPECIFICATION – CIVIL & INTERIOR | |A |CIVIL & WET WORKS | |A-1 |DISMANTLING | |1 |DISMANTLING OF FLOORING :- Dismantling of existing flooring and skirting including removing | | |base in cement mortar of any depth etc. and disposal of unserviceable material to the closest| | |dumping ground. | |2 |DISMANTLING OF BRICK WORK :- Dismantling of brick wall of all thickness in cement mortar, | | |including glazed tiles, cement plaster and disposal of unserviceable material as directed. | |3 |DISMANTLING OF RCC :- Dismantling of RCC work in lintel, beams, counters, slabs etc. including| | |cutting of reinforcement steel and disposal of unserviceable material as directed to municipal| | |dumping ground. |4 |DISMANTLING OF DOOR FRAMES & SHUTTER :- Dismantling of existing door frames and shutters and | | |stacking of serviceable material and disposal of unserviceable material to nearest municipal | | |dumping ground.. | |5 |MAKING CUT OUT IN SLAB/Wall :- Making cutout in slab upto to size of 0. 5 sqm including cutting| | |reinforcement and making good all opening for other allied works as directed. | |A-2 |MASONRY AND PLASTER | |1 |CLOSING OF CUT OUTS :- Closing of cut out in cement concrete and fixing of PVC sleeves as | | |directed. |2 |REPAIRING OF FLOORING:- Repairing of existing flooring of approximate width 150- 300mm taken | | |as average and 50mm deep in cement concrete 1:2:4(1cement : 2 coarse sand : 4 graded stone | | |aggregate) mixed and finished with cement mortar plaster 1:4 (1cement:4 coarse sand) etc. | | |complete as directed by the Architect. (for race way) | |3 |HALF BRICK WALL :- Providing and laying half brick partition wall with well burnt good quality| | |of first class designation 75 in cement mortar 1:4(1cement: 4 coarse sand) including providing| | |2 Nos of 6mm dia MS round bars at every IV th course, including scaffolding, curing rubbing | | |the surface, racking out joints etc. omplete as directed and specified for walls, at all | | |floor and levels, including 12 to 15mm thick cement plaster in 1:4:2(1cement:4 fine sand : 2 | | |coarse sand) | |4 |230MM THICK BRICK WALL :- Providing and laying 230mm thick brick wall with well burnt good | | |quality , class designation 75 in cement mortar I:4 (1cement:4 coarse and) including, | | |scaffolding, curing, rubbing the surface, racking out the joints etc. completed as directed | | |and specified for walls, at all floor and levels. | |5 |CEMENT PLASTER :- Providing and laying 12to 15mm thick cement plaster of mix 1:4:2( 1cement:4 | | |fine sand: 2 coarse sand) to all type of RCC work in line , level and plumb including smooth | | |cement finish as directed including providing necessary bands, drip moulds groove and wiremesh| | |at all junction of walls and ceiling including racking the joints or roughening the RCC | | |surfaces, necessary curing scaffolding etc. complete as directed and specified. |6 |REINFORCED CEMENT CONCRETE :- Reinforced cement concrete work with M-20 grade reinforced | | |cement concrete in lintels, beams counter, shelves including the cost of centering and | | |shuttering finishing and reinforcement at all height & levels | |7 |CEMENT CONCRETE UNDER FLOOR :- Providing and laying cement concrete under floor etc. at all | | |levels including the cost of centering, shuttering , finishing etc. complete | |* |1:4:8(1cement: 4 coarse sand: 8 graded stone aggregate 20mm nominal size) | |8 |POP Punning (6mm-12mm): Providing and fixing Average 6mm to 12mm thick POP Punning over cement| | |plaster in line & plumb finished smooth to receive paint. | |9 |POP Punning (25mm-30mm): Providing and fixing Average 25mm to 30mm thick POP Punning over | | |cement plaster in line & plumb finished smooth to receive paint. |10 |WATERPROOFING WORKS :- Providing and applying water proofing treatment to toilets, pantries | | |and other wet areas base and walls with four coats of Ta pecrete or approved equivalent mixed | | |with white cement in proportion 1:2( 1tapecete: 2 white cement) including mixing silica sand | | |in second coat in proportion 1:2:1. 5(1tapecrete :2white cement :1. 5 silica sand) and sealing | | |all junction corners and concrete after first coat with epoxy mortar as per approved | | |specifications of specialist agency. | |11 |Providing and laying on sunken areas light weight concrete of approximately 600 kg per cum | | |density laid, consolidated, cured, finished, smooth, including finishing and grouting with | | |water proof cement mortar and as per specification. |12 |Providing and applying Ardex HydrEpoxy -300 (Damp proofing Membrane) in two coats on walls, | | |floors as per Ardex directions & specification and as per Architects approval. (Server/UPS | | |room) | |A-3 |PAVING AND WALL CLADDING | |   |   | |1 |VITRIFIED TILE FLOORING (white colour) :- Providing and laying mirror polished 592x592mm | | |vitrified floor tiles of E uro make laid over adequate thickness of cement mortar | | |1:4(1cement:4carse sand) using chemical grouting aquamix/ laticrete grout 5mm, plastic | | |spacers Tile adhesive unitile make.The rate shall be inclusive of necessary preparation, | | |cleaning, protection with POP etc. complete (BR of tile to be taken as Rs 80/sft) | |5 |VITRIFIED TILE DADO (white colour) :- Providing and laying mirror polished 600x600mm | | |vitrified tile dado at Toilet and Pantry of Euro make laid over adequate thickness of | | |cement mortar 1:4(1cement:4carse sand) using chemical grouting aquamix/ laticrete grout 5mm,| | |plastic spacers Tile adhesive unitile make. The rate shall be inclusive of necessary | | |preparation, cleaning, protection with POP etc. omplete – (BR Rs 80/sft) | |6 |WALL TILES :- Providing and fixing 200x200mm ceramic tiles of Kajaria make shade as approved | | |by the Architect with balendura grouting, plastic spacer, tile adhesive , chemical grout of | | |balendura or e quivalent laid over 12mm thick cement mortar 1:4(1cement:4 coarse sand) | | |including cutting of tile in proper shape and size all complete as per design and drawing. | | |(B. R 35Rs/Sft) | |7 |ANTI STATIC VINYL FLOORING :- Providing and laying 2mm thk 600Ãâ€"600 tile PVC antistatic vinyl | | |flooring of approved shade and quality with adhesive, as per manufacturers recommendation and | | |specification etc. complete Cost of leveling as required to be included in the quoted rate. (LG| | |floors or approved equivalent) (BR 145/Sft) | |8 RAISED FLOOR :- The entire access floor system shall be made from steel cementitious infill | | |and provide for adequate fire properties, acoustic barrier and air leakage resistance. The | | |system shall be able to withstand a UDL of 1200kg. Per sqmt. And a point load of 360 kg. The | | |pedestal shall withstand Axial Load of 2200kg. | |   |PANELS: -Panels shall be made from steel. The bottom of the panel shall be embossed in | | |hemispherica l shape to give strength and flexural rigidity. The top sheet shall be plain and | | |resistant welded at various locations after the top and bottom sheets have been degreased and | | |phostated to form a single composit unit.The entire panel shall be quoted with epoxy coating | | |on the exposed surface and then the hollow panel shall have an infill of light weight | | |cementitious material, panel shall remain flat through and stable unaffected by humidity or | | |fluctuation in temp through out its normal working life. Panel shall provide for impact | | |resistance top surfaces minimal deflection, corrosion resistance properties and shall not be | | |combustible or aid surface spread of flame, panels shall be insulated against heat and noise | | |transfer. Panels shall provide qualities of concrete slabs, panels shall be of size 600x600mm | | |and 30 – 37mm thick fully interchangeable with each other within the range of a specified lay | | |out. Panels shall be free standi ng onto the structure. |   |Pedestal – Pedestals installed to support the panel shall be suitable to achieve a | | |specified floor height from the existing floor level and shall be placed 600mm distance in | | |both directions to form a grid of 600x600mm. Pedestal design shall confirm speedy assembly and| | |removal for relocation and maintenance. Pedestal base shall be permanently secured to position| | |on the sub floor mostly by effective glue of mechanical fastening for more than 600mm | | |finished floor height. Pedestal assembly shall provide for easy adjustment of levelling and | | |accurately align panels to ensure lateral restrain. or prevention of corrosion pedestals are | | |either powder coated or zinc electroplated as required. Pedestal shall support an axial load | | |of 2200kg. without permanent deformation and an ultimate load of 3500kg. The pedestal flat | | |head then shall receive the panel which shall be fastened by screws to the pedestal head to | | |f orm a rigid grid. (UNITILE/CANI-MICROTAC) | |* |300 mm high with high abrasion anti- static HPL in size 600x600mm. | |9 |TOILET COUNTER :-P/F 450MM deep clear granite counters @ Toilets, rate shall be incl. of 20mm| | |thk granite 200mm deep 20mm thk granite front fascia; 75mm thk. :2:4 RCC counter slab duly | | |cured; cutting & creating holes in slab & stone ; bull nosing in stone ; Include necessary | | |preparations, cleaning & protection w/ polythene & POP as required; all as per design & | | |Architect's approvals. (B. R. 160 per sft) | |10 |PANTRY COUNTER :-(2400X2100mm) Providing and fixing pantry counter 350/700 deep over head and | | |under storage with granite top and 200 high back splash, 600X600mm vitrified tile | | |cladding,over head and base cabinet made of laminated shutter of 20mm BWP board . All internal| | |surfaces to have balancing laminate.The rate inclusive of necessary hardware,140 HIGH D | | |shaped Hetitch handle code no 011869 lock sets, self closing hing es, spring loaded shutter, | | |latch inside, all cabinet hardware to be†HETTITCH† or equivalent complete as per Architects | | |approval. (BR to be taken as Rs 160/sft) | |11 |PERIMETER GLAZING CILL/LEDGE :-Providing and laying , laminated cill/ ledge comprising of | | |1mm thick laminate over 19mm thick commercial board with 32Ãâ€"12 beech wood lipping and clear | | |transparant silicon sealant at junction with wall and glass. all complete as per design and | | |drawing. | |* |150 wide with moulding at window level. |12 |STEPS IN SERVER & HUB ROOM:- Providing and fixing in position steps in server room made of | | |hard wood frame work of 75Ãâ€"75 section laid to receive 19mm thick commercial ply to be screwed | | |to the hard wood frame work complete as directed. | | |   | |B. |DRY WORKS | |   |   | |B-1 |PARTITIONS AND WALL CLADDING | |   |   | |1 |FULL HEIGHT GYPSUM PARTITION (100MM THICK) :- Providing and fixing 100mm thick gypsum board | | |partitio n comprising of 48mm proprietary vertical studs , Two layer of 12. mm thick gypboard | | |on both sides of 48mm GI studd as per manufacturers specification (â€Å"India Gypsum make†) | | |including 50mm, (24 kg/cum) thick glass wool insulation of UP Twiga make grade specified by | | |the Architect from raw floor to the bottom of ceiling (Rate to be inclusive of GI corner | | |beads, hard wood scantling and other GI accessories finished with proprietary topcoat) | | |(including plastic emulsion paint) | |2 |Item same as above of 100mm thick gypsum partition but with hard wood framing instead of G. I | | |proprietary channel/ stud. | |3 |Item same as above of 100mm thick gypsum partition but above false ceiling. | |4 |PROVIDING ADDITIONAL LAYER OF:- | |a |Extra for providing single layer of MDF board in place of single layer of gypsum board) | |b |Extra for over and above of Item 1 for providing additional layer of 8mm+4mm thick MDF board| | |screwed/ nailed on one side of par tition. |c |Extra for over and above of Item 1 for providing & fixing additional layer of 12mm thick BWP | | |ply screwed/ nailed on one side of the partition | |d |Extra for over and above of Item 1 for providing additional layer of 12mm thick bison board | | |screwed/ nailed on one side of the partition | |e |Extra for over and above of Item 1 for providing and fixing 1mm thick laminate pasted over 4mm| | |thick MDF board over 8mm MDF board glued/ nailed with the existing partition. | |f |Extra for over and above of Item 1 for providing 4mm thick veneer duly melamine fixed over 8mm| | |thick MDF board glued/ nailed with the existing partition. | |g |Extra for over and above of Item 1 for providing extra layer of gypsum board nailed / screwed | | |with the existing partition. (without paint) | |5 |75MM THICK GYPSUM PARTITION :-Item same as above of 1 but with two layer of 12. mm thick | | |gypboard on one side only of studd all as per manufacturers specification (â€Å"India Gyps um | | |make†) (Rate shall be inclusive of GI corner beads, hard wood scantling and other GI | | |accessories finished with proprietary topcoat ready to receive paint. ) & closing of opening | | |made for duct and other piping work etc. (including plastic emulsion paint) | |6 |DUCO PAINTED PANELLING (62MM THICK):-Extra over 100mm thick partition for providing and fixing| | |MDF panelling fixed over 8mm + 4mm thick MDF board including metallic duco paint of (Belco | | |shade) as approved by the architect, including all hardware, â€Å"V† groove etc. complete as per | | |architects approval. |7 |132 THICK FIRE LINE BOARD PARTITION:-Providing and fixing 132 mm thick fire line partition two| | |layers of 15mm thick fire line board on both side of 70mm studs as per manufacturers | | |specification (â€Å"India Gypsum make†) including Vapour barrier and mineral fibre wool | | |insulation from raw floor to bottom of ceiling. Complete as per manufacturers specification. | |8 |110 THICK FIRE LINE BOARD PARTITION:-Providing and fixing 110 mm thick fire line partition two| | |layers of 15mm thick fire line board on both side of 48mm studs as per manufacturers | | |specification (â€Å"India Gypsum make†) including Vapour barrier and mineral fibre wool | | |insulation from raw floor to bottom of ceiling. Complete as per manufacturers specification. |9 |WOODEN SKIRTING;- Providing and fixing 12mm thick and 50mm high beech wood skirting flushed| | |to wall/gypsum partition with wooden plugs including all necessary nails, screws melamine | | |polishing on exposed surfaces, fire retardant paint etc. complete as per design and drawing. | |10 |VENEER PANELLING:- Providing and fixing veneer panelling made of hard wood framing fixed with | | |one layer 12mm thick MDF board & 8mm thick MDF board fixed/ pasted with 4mm thick veneer of | | |approved shade in batten form including making 10mm wide groove filled with metalic laminate | | |of Ventura make all hardware melamine polishing etc. complete as per architects approval. |11 |VENEER PANELLING:- Providing and fixing veneer panelling made of 8mm+ 4thick MDF board fixed | | |over hard wood framing pasted with 4mm thick veneer including making 4X4mm groove, all | | |hardware melamine polishing etc. complete as per NSN/architects approval. | |12 |WALL TRACTS FABRIC PANELLING:- Providing and fixing fabric panelling over hard wood framing | | |and MDF base and pinnable cellotex board to be installed as per design and drawing including | | |wall tracts channels, and 35mm wide laminated band at top andbottom complete as per | | |manufacturers specification. BR of fabric to be taken as Rs 500/rmt) | |13 |FABRIC PANELLING:- Providing and fixing fabric panelling over hard wood framing fixed with | | |fabric wrapped over 12mm cellotex board with 3mm cushion backing including all hardware, | | |fireretardant paint etc complete as per design and drawing. (Basic rate of fabric to be taken| | |as RS. 500/ meter) | |   |   | |14 |PROJECTED MDF POSTER PANEL:- Providing and fixing projected MDF panel pasted with laminate of | | |approved shade to receive the digitally printed graphic vinyl poster. |   |   | |15 |3M FILM OVER GLASS SURFACE:-Providing and fixing 3M scotchcal 3650-114 printed with 3M over | | |laminate 8952 with 5 yrs MCS warranty (By 3M India) over glass surface complete as per | | |approval of the Architect. (only film surface area shall be measured and paid) | |16 |3M FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M scotchcal 7725/324 over glass | | |surface with 15 yrs MCS warranty (By 3M India) as approval of the Architect. (only film | | surface area shall be measured and paid) | |17 |3M GRAPHIC FILM OVER MDF/GLASS SURFACE:-Providing and fixing 3M controltech comply with 3M | | |over laminate digitally printed with 5 yrs MCS warranty (By 3M India) as approval of the | | |Architect. (only film surface area shall be measured and paid) | |18 |G LASS PANELING :- 6mm thick SaintGobain Lacquered glass fixed/pasted to BWP ply/MDF base | | |complete as per design and drawing. (only glass surface area shall be measured and paid) | |19 |GLASS PANELING :- 6mm thick SaintGobain Lacquered glass fixed/pasted to BWP ply/MDF base | | |with hard wood framing and SS surround complete as per design and drawing. | |20 |WALL PAPER:-Providing and fixing wall paper (Vinyl wall covering) of VESCOM, Orient quality | | |(Code 146. 2)distributed by Wall Tracts on POP/ Gypboard surfaces with suitable addhesive as | | |per manufacturers specification. (BR 140 sft) | |21 |EDGE PROTECTION PROFILE:-Providing and fixing 25Ãâ€"25 wide GI edge protection profile of India | | |Gypsum make at all the corners of the wall/column as per Architects approval. | |22 |HARD WOOD FRAMING:- Providing and fixing 50mmx50mm hard wood framing in partition as vertical | | |and horizontal supports for overhead storage's, white boards, art works LCD screens etc. | | |incl uding fire retardant paint etc. omplete as per direction of the Architect. | |23 |DUCO PAINTED JAMB:-Providing and fixing 20X125mm thick Duco painted jamb fixed to the hard | | |wood framing and commercial ply with 4mm thick MDF board etc. complete as per approval. | |24 |SS CORNER EDGE PROTECTOR:- Providing and fixing 50Ãâ€"50 SS angle edge protector with and wooden | | |steps all accessories as per approval of the Architect. | |25 |CORIAN COUNTER:- Fabricating, supplying and placing in position corian counter 550 wide made| | |of corain cladded over commercial board with facia supported with 80 dia SS legs of HETITCH | | |make height adjustable Code No. 46064 covered with commercial ply and laminate at bottom | | |as per approval of the Architects. (BR of Corian to be taken as Rs 750/sft) (at Cafeteria) | |26 |Aluminium Glazed partition having 10 mm tempered glass. Section of Aluminium shall be as per | | |manufacturer specification. Make – Alloy / To be Proposed by Design er/Vendor basis Acoustics | | |and overall Aesthetic quality | |27 |Aluminium glazed partition with 6mm+6mm laminated glass with vinyle in between two glassess | | |. section of Aluminium shall be as per manufacturer specification. Make – Alloy / To be | | |Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | |   |   | |   |Notes:- | |   |   | |* |1)All beech wood and veneer to be seasoned and melamine polished to shade as / architects | | |approval | |* |2) All stainless steel cladding work to be provided and fixed by Architect approved specialist| |* |3) All hardwood to be seasoned and painted with anti-termite and fire retardant paints. | |* |4) All partition to be erected from floor to the bottom of the ceiling (Ceiling ht. + 3900), | | |filled with sound insulated material, as specified & directed by the architect. | |* |5) All partition to be extended upto existing window mullions, when it comes in contact with | | |the existing window and to be airtight closed all widow edges to have 4 mm groove with silicon| | |fill. | |* |6) All openings for the cutouts for ducting/raceways/cables etc. in the partitions to be | | |closed & made air tight. |* |7) The rate shall be inclusive of GI corner beads, hard wood scantling and other GI | | |accessories finished with proprietary topcoat ready to receive paint and providing minimum 70b| | |sound barrier. | |* |8) All materials shall be as per manufacturers specification (â€Å"India Gypsum make†) and | | |insulation material shall be as manufacturers specification (â€Å"UP Twiga make†) | |* |9)Contractor to procure certification from manufacturer of sound insulativeness of partition. | |* |10) Rate to include for fixing of hard wood framing below false floor level as required. |* |11) Rate to be inclusive of GI corner protector angle of India Gypsum make. | |B-2 |CEILING & FLOORING | |1 |GYPBOARD CEILING :- Providing and fixing suspended false ceiling, which includes providing and| | |fixing GI perimeter channels of size 0. 55mm thick having one flange of 20mm and another flange| | |of 30mm and a web of 27mm along with perimeter of ceiling, screw fixed to brick wall/partition| | |with the help of nylon sleeves and screws at 610mm centers. The suspending GI intermediate | | |channel of size 45mm, 0. mm thick with two flanges of 15mm each from the soffit at 1220mm | | |centers with ceiling angle of width 25mmx 10mmx 0. 55mm thick fixed to soffit with GI cleat and| | |steel expansion fastene. Ceiling section of 0. 55mm thickness having knurled web of 51. 5mm and | | |two flanges of 26mm each with lips of 10. 5mm are then fixed to the intermediate channel with | | |the help of connecting clips and in direction perpendicular to the intermediate channel at | | |457mm centers. 12. 5mm tapered edge Gypboard (Conforming to IS- 2095-1982) is then screwed | | |fixed to ceiling section with 25mm dry wall screw at 230mm centers. Screw fixing is done | | |mechanically. |   |Finally the boards are to be jointed and finished so as to have a flush look which includes | | |filling as finishing the tapered and square edge of the boards with joining compound, paper | | |tape and two coats of primer suitable for Gypboard (as equivalent) extra frame work for | | |electrical fittings, A/C diffusers, and/or any other cutout, trap doors, wooden shadow battens| | |(hollock wood black enamel painted-25x40mm) at wall peripheries and ends, 12mm thick MDF board| | |for pelmet etc. complete including opening to be made for AC grills, light fittings, trap | | |doors etc. (The quoted ate shall be inclusive of suspenders at all heights) ( The rate to be | | |quoted including plastic emulsion paint) | |* For horizontal & vertical surfaces | |   |   | |2 |DOUBLE SIDE COVE LIGHT:- Providing and making double sided cove light in gypboard including | | |lastic emulsion paint. | |3 |SINGLE SIDE COVE LIGHT:-Providing and making single side cove lig ht in gypboard including | | |plastic emulsion paint. | |4 |ACOUSTIC CEILING TILE (WHITE) :- Providing and fixing of Armstrong Acoustical Ceiling system | | |with Dune Max Microlook edge Tiles with SILHOUTTE† grid and shadow angle of size 600x1600x18mm| | |laid on 24mm hot dipped galvanized steel suspension system.The tile should have thickness of | | |18mm and humidity resistance of 95% RH, average NRC 0. 7, sound attenuation of 20db, light | | |reflectance >84%. Thermal conductivity k= 0. 036 w/mk, colour white , fire performance 0/class | | |I (BS-476) Installation to comprise main runner spaced at 1200mm maximum centres. The last | | |hanger at the end of each main runner should not be greater than 450mm from the adjacent wall. | | |Flush fitting 1200mm long cross tees to be interlocked between main runner at 600mm centres to| | |form 1200x600mm module. Perimeter trim to be Armstrong wall angle of size 19x19x3000mm, | | |secured to wall at 450mm maximum centres. |5 |TRAP D OOR:- Providing and fixing trap door in false ceiling made of â€Å"Novapan â€Å"prelaminated | | |board , dead locks, lipping all around including all hardware, hinges etc. complete as per | | |design and drawing. | |6 |CEILING PELMETS;-Providing and fixing 19mm thick B. W. P pelmets with hard wood lipping and | | |fixied to ceiling with hard wood framing complete including painting. (as indicated in the | | |drawing) to take vertical blinds. | |7 |MOTORISATION SCREEN PELMET AT CEILING:- Providing and fixing motorisation screen pelmet of | | |size 150mm x150mm with hard wood and commercial board with edge lipping etc complete. | 8 |BACK PAINTED PLY:-Providing and fixing black painted 6mm thick commercial ply over hard wood | | |framing above pelmet as per Architects approval. | |9 |PROVIDING AND FIXING :- 6mm th. commercial ply backing on mineral fiber modular false ceiling| | |tiles to support light fitting, speakers, CCTV cameras, diffuser of grid work size with | | |necessary cut outs for the same. | |10 |AC GRILL PROTECTOR:- Providing and fixing 150mm wide, 4mm thick black painted commercial ply | | |behind AC grill to avoid visibility of the services above the false ceiling as per Architects | | |instruction. |B-3 |DOORS | |   |   | |* |All door frames to be braced from raw floor slab upto soffit of ceiling slab. All rates to | | |include requisite hard wood frame work to be provided below finish floor/false floor and | | |finished ceiling of supporting glazing section and floor springs. | |* |All 4mm thick veneer should be as per Architects approval & duly polished. | |* |All door fame to be seasoned best quality steam beech wood or duco painted as per | | |specification and Architects approval. |* |Flush door made out of boiling water proof kiln seasoned, styles, rails for minimum thickness | | |45mm & treated with preservatives as per IS:2002 | |* |All flush doors shutter lipping to be 12Ãâ€"45 melamine polished white beech wood or duco pain ted| | |as per specification and Architects approval. | |* |All wood to be treated with anti-termite and fireretardant paint. | |* |Contractor to prepare sample of all door frames, shutters and glazing type for Architects | | |approval. | |* |Contractor to submit sample board for all hardware for Architects approval. | |* |All seasoned white beech wood & veneer to be duly melamine polished as per Architects | | |approval. | |* |All laminate to be 1mm thick as approved by the Architects | |* |Contractor shall provide all necessary protection of glass until handover. |* |All glass doors/windows to be 12/10mm thick clear float tempered glass with mirror polished | | |edges. As per specification | |* |Cost to include 3M frost film (Crystal Quality) | |* |Joints between glazing in door/ windows to have silicon sealants. | |* |Glass in patch fitting door/windows to be 12mm thick with clear float tempered glass with | | |mirror polished edges. | |* |Wherever shown powder coated extruded al uminium transfer grill size would be as per drawing | | |or as mentioned in the boq. | |2 |ED2 (1000X2100) ,12mm thick single leaf tempered glass door .The rate should be inclusive of | | |all hardware , OZONE make door handle 25Ãâ€"1200 H shape 304 grade , floor spring FS9400, patch| | |lock OPL-1 , ceiling mounted door stopper, etc complete as per design and drawing. (Ent door) | |   |   | |3 |G1 (12670X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ€"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. |4 |G2 (7800X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |f itting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ€"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. ( touchdown cafe ) | |5 |G3 (6530X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling and 4 nos 50X200 mm duco painted wooden mullions as/app, The | | |rate should be inclusive of all hardware OZONE patch fitting, top patch OPF-2, bottom patch | | |OPF-3, OZONE make door handle 25Ãâ€"1200 H shape 304 grade , floor spring FS9400, patch lock | | |OPL-1 , ceiling mounted door stopper all complete as per design and drawing. Touchdown | | |cafe ) | |6 |G4 (3300X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ€"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. (Meeting room) | |7 |G5 (2230X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ€"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. Meeting room) | |8 |G6 (3000X2100) Fixed glazing,12mm thick tempered glass fixed with Jeb Aerofoil/aero span | | |member fixed with SS U channel at floor and inside the ceiling, The rate should be inclusive | | |of all hardware OZONE patch fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door | | |handle 25Ãâ€"1200 H shape 304 grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted | | |door stopper all complete as per design and drawing. (Collaboration) | |9 |D1 (900X2100) ,38mm thick single leaf laminated flush door . The rate should be inclusive of | | |all hardware , OZONE make door handle 25Ãâ€"1200 H shape 304 grade , floor spring FS9400, patch| | |lock OPL-1 , ceiling mounted door stopper, etc complete as per design and | | |drawing. Pantry,store, Quite room) | |10 |D2 (1200X2100) Single leaf with vision panel (300Ãâ€"300) with wired glass, access controlled | | |door of non metallic 50mm thick asbestos free composite fire & smoke check shutter comprising | | |of two non – combustible boards 12mm thick sandwitching 20mm thick fire resistant filler of 2| | |hour fire rating resistance rating confirming to BS: 476 part-22 IS: 3614 suitable for | | |mounting on duco painted wooden frame of size 50X125 mm both side laminated, 2 hr. fire rated | | |vision glass panel with heat activated intumescent fire seal strip of size 12x4mm fixed on all| | |three sides except bottom and frame s hutter to be mounted with SS fire rated hinges with | | |necessary screws and one coat of anti termite fire resistant primer. Rate shall be inclusive | | |of all hardware OZONE make door handle 425 long OGH-55, OZONE door closer NSK 980 with track | | |arm and hold open function with SS cover, hinges, all complete as per design and | | |drawing. Server room) | |11 |(1800X2650) Double leaf Door comprising of 10mm thick toughened glass with Aluminium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |12 |(1200X2650) Single leaf Door comprising of 10mm thick toughened glass with Aluminium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia.Complete as per detail | |13 |(1000X2600) Single leaf Door comprising of 10mm thick toughened glass with Alum inium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |14 |(900X2600) Single leaf Door comprising of 10mm thick toughened glass with Aluminium frame of| | |Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality having| | |stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |C. BUILT IN FURNITURE | |1 |FULL HEIGHT STORAGE:- Providing & fixing Storage cabinets made out of 19mm commercial board | | |with 1 mm thick laminated shutter in facia and balancing laminate all inside adjustable | | |laminated shelves,50X12mm veneered finish band alaround, 20mm laminated groove, 50mm high | | |laminated skirting. Rate should be inclusive of necessary Hardware- 140high D shaped Hetitch | | |handle code no. 011869, Lock sets, self-closing hinges, spring loaded shutter latch inside, all| | |cabinet hardware to be HETITCH make & as/Architects approval. | |2 |ELECTRICAL D. B. CUPBOARD:- Providing & fixing cupboard for D. B. panel cabinets comprising | | |shutters constructed from 20mm thick. comm. board finished in 1mm thick. laminate. and | | |balancing laminate inside, carcass constructed from 19 mm thick.Bison Board all inside, | | |12Ãâ€"50 wooden band alaround, with 20mm groove, Provide 150Ãâ€"300 powder-coated aluminum louvered | | |grills on each shutter, requisite cutouts for ventilation above and servicing trap door below. | | |Rate should be inclusive of necessary Hardware- 140high D shaped Hetitch handle code no | | |011869, Lock sets, self-closing hinges, spring loaded shutter latch inside complete as per | | |Architects approval. | |3 |Fax Printer Counter SIZE( 3490X2100) :- unit to include base cabinet, overhead cabinets, | | |pinup boards in fabric and 12mm thick tempered glass cladding pasted with 3M digitally printed| | |graphic film fixed with SS studs.Base cabinet to have wire dump channel with brush & OH | | |cabinet to have lighting pelmet as shown Constructed from best quality water proof board / | | |plywood. Top to be manufactured out of 25mm thk HPL post formed MDF board. and 200 high | | |laminated finish band. All over head shutters to have laminate outside and counter-laminated| | |inside, partitions and shelves to be finished with 1mm thk. laminate on all sides, BR of | | |fabric to be RS 500/- per Rm. The rate shall be inclusive of all hardware- 140 HIGH D shaped | | |Hetitch handle code no 011869, self-closing hinges, spring loaded shutter latch inside,, | | |complete as per architect's approval. |4 |VENDING COUNTER SIZE (2915X2100) :- Providing and fixing break out vending counter includes | | |under counter storage , vending counter made of 40mm thick corian top over BWP,200 high corian| | |back splash,base cabinet made of laminated shutter of 19mm thick BWP with shelves and | | |partitions in balancing laminate, with 6mm thick saint g obain glass cladding above back splash| | |and 100mm high laminated skirting. The rate shall be inclusive of necessary hardware, 140 | | |high D shaped Hetitch handle code no. 011869 lock sets, self closing hinges, spring loaded | | |shutter, latch inside, all cabinet hardware to be†HETTITCH† or equivalent complete as per | | |Architects approval.. |5 |WORKING COUNTER:- Providing and fixing in position fixed work counter made of 25mm thick | | |HPL post form laminated top with key board tray and 3 drawer mobile pedestal unit and every | | |1200 length of the work counter over head storage unit and pin up board including all glues, | | |nails, sliding channel, bracket for support fixed to portition, hinges, 140 high D shaped | | |Hetitch handle code no 011869, multipurpose locks, wire manager etc. complete as per design | | |and drawing. | |6 |OVERHEAD STORAGE UNITS: Providing and fixing 350 deep & 600 high Overhead Storage Units at | | |constructed from best quality bwp comm. board shutters to have 1mm thick laminate outside & | | |counter laminated on inside. Internal partitions & shelves also to be laminated.Hardware140mm| | |high D shaped Hetitch handle code no 011869, Lock sets, self-closing hinges, spring loaded | | |shutter latch inside, all cabinet hardware to be of Hetitch make as approved by the Architect. | |   |TOTAL FOR BUILT-IN FURNITURE (RUPEES) | |   |   | |D. |LOOSE FURNITURE | |   |Fabricating supplying and placing in position various types of furniture made of Ist class | | |white beech wood, commercial/BWP ply/ board 4. 0mm thick steam beech veneer, 1. mm thick | | |laminate, brushed steel sheet, internal hardwood framing all necessary hard ware like nails, | | |screws, magnetic catchers, hinges, handles, knobs etc. complete as per design and drawing. | |1 |RECEPTION TABLE SIZE (2400X700X1190high) :- Made of corian panel, corian counter top and | | |laminate on under side of the top and on inner side of the panel, 3 draw er pedestal unit with| | |SS legs 140 high D shaped Hetitch handle code no. 011869 made as as per deign and drawing. | | |(BR of Corian to be taken as Rs 750/sft) | |2 |GUARD TABLE AT LOBBY:- TABLE SIZE (900X600X1000high) Combination of laminated commercial and | | |duco painted MDF in Z shape as per approval. |   |   | |3 |MEETING ROOM CREDENZA:- Fabricating supplying and placing in position meeting room credenza of| | |size 1500x400x750 high made of 32mm thick laminated finished top with PVC edge banding | | |laminate shutter, adjusable shelves, all internal surfaces to be laminated supported on SS | | |base 140 high D shaped Hetitch handle code no. 011869, locks etc complete as per design and | | |drawing | |4 |Providing and fixing of BROCHURE RACK of size 1500 & 100deep at top and 250 dep at bottom | | |made as per design and drawing. No | |5 |COMPANY LOGO:-Providing and fixing company logo (Nokia Siemens Networks) in 8mm thick acrylic | | |sheet pasted with digitally print ed graphic film. Complete as per Architects approval. |6 |PICTOGRAMS (SS Door Signage's): Providing and fixing Stainless Steel Finish pictograms over | | |doors, walls with double solid with 3M tape & images/ letters with silk screen printing | | |technology over all size of pictogram to be 148x147mm (To be got executed by Millennium | | |Business Associates) | |7 |FOLIO (SS Name Plate):- Providing and fixing folio with size of 200x45mm brushed SS sheet | | |stuck to surface with 3M double sided tape, letters in black coloured etching embossing fonts | | |as approved. (To be got executed by Millennium Business Associates) | |8 |FLOOR MATS :- Providing and fixing 3M Brand Nomad mat – 7150 poly vinyl coil loop design with | | |vinyl foam backing made as per manufacturers specification. |9 |WHITE BOARD :- Providing and fixing white magnetic board of Alkosign display system (Alkosign | | |) on wall and fixed with all necessary arrangement as per manufacturers specifications etc. | | |complete. | |* |1050Ãâ€"1200 | |* |1200 x 1200 | |* |1800 x 1200 | |   |   | |10 |ALUMINIUM/PENCIL TRAY FOR MARKER BOARD:-Providing and fixing aluminium tray below white marker| | |board for keeping accessories. |   |   | |11 |SLOTTED ANGLE RACK:- Fabricating, supplying and placing slotted angle rack of size | | |900wx2100hx600deep made as per manufacturers specification. | |12 |TACK BOARD :- Providing and fixing pin-up board made of 12mm thick cellotex / jelly board | | |fixed with kail wood frame work and 6 mm thick commercial ply backing covered with fabric | | |fixed to wall with screws surrounded with fabric steam beech wood lipping with melamine | | |polishing etc. complete as per design and drawing. (Basic rate of fabric to be taken as Rs. | | |250/meter) | |13 |TV BRACKET :-Providing and fixing TV bracket for wall mounting 29†³ Television set. |14 |TOILET MIRROR:-Providing and fixing 12mm thick tempered float glass pasted with 3M film | | |(crystal qualit y) as approved by the architect and mounted on four numbers 19mm dia brushed SS| | |studs, complete as per design and drawing. | |15 |SS TRASH BIN:-Supplying and placing in position SS trash bin 500 dia and 800 high as per | | |Architects approval. | |16 |DLINE MAKE TOILET ACCESSORIES | |   |Providing and fixing the following fixtures of Dline make SS brushed finish. | |* |Bottle opener (Item code 14. 7071. 02. 000) | |* |SS coat hooks | |* |Toilet paper holder | |   |Soap dispenser (Item code 14. 7045. 02. 002) | |* |Mini Waste paper basket 14. 7097. 02. 000 | |* |Waste paper basket 14. 7085. 02. 201 | |* |Wall mounted paper towel dispenser | |* |Supply of Dline satin stainless steel 316 grade grab bar. 14. 4614. 02. 300 | | |14. 4963. 02. 21 | |17 |TOILET ACCESSORIES | |   |Providing and fixing the following fixtures of Kimberly Clark/ Dream Craft make or equivalent | | |make | |* |Bottle opener | |* |SS coat hooks | |* |Toilet paper holder | |* |Soap dispenser (Kimb erly clark make) | |* |Soap dispenser (BOB BRICK make in brushed finish Code B-4112 26GB) | |* |Mini Waste paper basket (WC) | |* |Waste paper basket | |* |Push Bin (Code SE 4020T) | |* |Wall mounted paper towel dispenser | |* |Providing and fixing grab bar 600mm c. p. wall flange at end of bars with heavy duty anchor | | |fastner & accessories. (FOR HANDICAP TOILETS ONLY). |18 |FLOOR DIRECTORY: Providing and fixing wall mounted floor directory with slk screen printing | | |text of approved colour and consisting of the following plates | |* |1) 1 Nos, 4mm thick aluminum plates painted in dark Grey in colour of over all size 300x55mm. | |* |2) 8Nos, SS 316 grade plates of 2mm thick with over all size 300x30mm. | |19 |TRANSITION PROFILE:- P/F transiction profile of SS L-section 6mm thk between two different | | |flooring materials | |20 |URINAL PARTITION:-Providing and fixing of urinal partition in 12mm thick toughened glass with | | |frosted film fixed with SS bracket as per desig n and drawing. |21 |Wash basin with water sancer | |22 |American satndard WC | |23 |Plumbing & sanitary work | |24 |SOFA in reception area (images of proposed sofa to be submitted along with the quote) | |25 |Sofa chairs for pantry / breakout (images of proposed sofa chairs to be submitted along with | | |the quote) | |26 |Tables for pantry / breakout (images of proposed sofa chairs to be submitted along with the | | |quote) | |27 |Tables for reception sofa (images of proposed sofa chairs to be submitted along with the | | |quote) | |   |TOTAL FOR LOOSE FURNITURE (RUPEES) | |   |   | |E. |FINISHES | |1 |PLASTIC EMULSION PAINT (ICI Dulux make) on walls and gypboard/POP ceiling including surface | | |preparation, primer coats, leveling patti and minimum 3 coats of brush and roller finish. | |2 |PASTEL COLOUR:- Extra over Item No-1 of plastic emulsion paint but for pastel colour. | |3 |OIL BOUND DISTEMPER (O. B. D) :- Providing and applying O. B.D paint of desired colour finish or| | |equal including necessary base work, preparatory work. | |4 |PROVIDING AND FIXING SILICONE SEALANT around all toilet fixtures including urinals, WCs & wash| | |basins etc. | |5 |TEXTURE PAINT:-providing and applying texture paint on wall of approved brand and manufacturer| | |after scrapping, having the existing finish and applying primer coat. | |6 |ARMOUR COAT PAINT:- Providing and applying polished platser of Armourcoat or equivalent as of | | |approved colour on wall/ Ply surface including surface preparation primer coat as per | | |manufacturers specification. BR to be taken as Rs 160/sft) | |F. |SUPPORT SERVICES | |1 |Support services to modular furniture, Carpet vendor, chair supplier, and other furniture | | |suppliers including taking delivery of consignments brought to site,safe storage, removing | | |wrapping, moving and placing them at proper locations prior to final hand over. Coordination | | |and assistance to fire detection / supression and security systems vendor for their scope of | | |work | |G. Sprinkler works (including testing and commisioning) | |   |C. I butterfly valve of approved make,with nuts, bolts, gaskets, flanges, coupler etc. complete| | |as specified. | |   |Flap Type Non Return Valve | |   |G I. ‘C' Class pipes as per IS 1239 with Flanged , Screwed or welded joints with necessary | | |Specials, clamped to wall, beams or ceilings as per specifications with approved anchor | | |fastners; MS brackets,testing to 13. 5 Kg/Sq. cm hydraulic pressure after installation, and | | painting two coats of enamel paint of approved colour over two coats of primer. | |   |Conventional Sprinkler (pendant / upright) quartzoid bulb type with 15mm screwed end | | |connection of 68 deg. C. temperature rating,K 80 and orifice shall not be less than | | |6mm. Sprinklers shall be UL Listed / FM approved with Chrome finished. | |   |Rosette plate (Recessed type, in two piece) for Sprinklers below false ceiling area. ) Same | | |should be fabricated by M. S. plate of 2mm thick and the finish shall be powder coated and | | |color shall be as approved by architects / clients. | SPECIFICATION FOR CARPET | | | |SN |DESCRIPTION | |   |SUPPLY & LAYING OF CARPET AS PER THE FOLLOWING SPECIFICATION | |   |   | |   |Threads | |   |   | |   |Specifications | |   |   | |1 |Fibre – 100% Nylon | |   |   | |2 |Yarn weight – 20 oz | |   |   | |3 |Backing – Non PVC | |   |   | |4 |Density – Greater than 4500 | |   |   | |5 |Gauge – 1/10 | |   |   | |   |Make : Shaw / interface / Milliken / Tandus / Bonar floor | | |Specifications- MEP WORKS | |Sr. No |Particulars | |   |SUMMARY | |A |M. V. SWITCHGEAR | |B |M

Wednesday, January 8, 2020

A P By John Updike - 1532 Words

Paper 1: AP by John Updike In this essay I will be reviewing the six elements of fiction: point of view, plot, setting, characterization, symbolism, and theme in the story, AP by John Updike, to see how it constitutes to the work as a whole. Sammy, a 19-year-old cashier at the AP, narrates AP. In this first-person narrative, the narrator tells us everything as he sees it, but since it is a limited point of view the narrator is unreliable. But this allows the reader to notice growth in the character and it helps demonstrate how the narrator is different than the people around him, as his actions suggest. We notice a change in the point of view as the story progresses. At first we see the narrator complaining about the conformity in his society then later acknowledges the problem and acts on it. This occurs with the introduction of the girls, who are seen as mocking the conformity by wearing bathing suits into AP. Seeing this, the narrator tries to show support for this act unconformity by quitting his job at AP removing his bow tie and apron in the process when he feels the girls were mistreated and asked to leave store. With the introduction of the issue of conformity, which is a serious issue, we still notice the use of humor and irony in the tone though at the end even though the narrator felt he did the right thing by pointing out that the way the girls were treated was wrong and quitting his job, but he was left lost as his act was seen unnoticed, ending the storyShow MoreRelatedA P By John Updike982 Words   |  4 PagesThe story that this research paper is being written over is â€Å"AP† by John Updike. This story is filled with good grammar and has a well written plot and good transition. A person reading the story â€Å"AP† could see it as an interesting story filled with good symbolism. The main character, Sammy, uses a great deal of symbolism when describing the three girls in bathing suits who walked into the store he works in. the three girls in bathing suits that walked into the store where the center of the wholeRead MoreA P By John Updike1190 Words   |  5 PagesA P is a story of Sammy who is a 19 year old boy working as a clerk at a grocery store in a small town in New England. Published back in 1961 narrative defining A P is the popular mythology of 1960s basically where youthful rebellion powers took over the soulless system. (Sustana) Therefore Updike has written a story that includes key elements of myth along with the background of postwar prosperity and the attendant consumer culture. Where there is a strong hint of the Cold War as hero characterRead MoreA P By John Updike1704 Words   |  7 PagesIn the story AP by John Updike a young cashier by the name of Sammy learns about the power of desire and the mystery of others minds when working at an AP supermarket in a small town north of Boston in the 1960’s, where there was a lot of social norms and many people didn’t step out of them. The young nineteen-year-old Sammy wasn’t expecting his Thursday shift at AP to go the way it did when income three young girls but, these are not your socially normal teenagers who come walking in the doorRead MoreA P By John Upd ike1160 Words   |  5 Pagesthe girls’ exit and regret fills him. What he thinks is noble and just becomes a changed, regretful soul. In â€Å"AP† by John Updike, the symbolism portrays the theme of the desire for change. The girls’ immodesty is a symbol of rebellion, revealing the theme of the desire for change. As Sammy acknowledges in the short story, the story takes place â€Å"north of Boston† (Updike 360). The estimated time period is the 1960s. At this time, most of the younger generation longed for change, whichRead MoreA P, By John Updike1019 Words   |  5 Pagespsychoanalytical lens can be used to analyze AP, a short story by John Updike, lone, a piece of art by John William Godward, and â€Å"To My Best Friend - Short Film†. Through this lens, readers can draw the theme that all humans have basic instincts and urges that lie in the unconscious mind. Throughout Updike’s AP, it stands clear that we are always being influenced by fundamental human desires. AP is told from the perspective of Sammy, a teenage cashier at AP. In the beginning of the story, three teenageRead MoreA P By John Updike843 Words   |  4 Pageshelp establish the uniqueness of his or her use of speech through the story’s title, structure, punctuation, setting and the communication between characters. In the story A P by John Updike, the author sets the story in a very ordinary place where everyday people go shopping for their groceries, in a market known as A P. Updike’s style within the story shows many aspects of ordinary life. For example, in the first sentence of the story, the narrator Sammy uses incorrectly the word walks, â€Å"InRead MoreA P By John Updike1441 Words   |  6 PagesJohn Updike is considered one of the greatest writers in modern American history. He is known for the idea that seemingly ordinary aspects of American life are actually quite fascinating. He wanted readers to see the beauty and magic of life, so he tried to describe everyday things using the most clear but beautiful language possible. Many of Updike’s pieces are drawn from his own life such as his marriage and his boyhood, as shown in three of his short stories: â€Å"AP†, â€Å"Ace in the Hole†, and â€Å"PigeonRead MoreA P By John Updike765 Words   |   4 PagesJohn Updike wrote, â€Å"A P† in 1961. In this era of the 1950s and early 1960s, conservative dress mirrored conservative social values. Conformity was the measure of popularity as well as a measure of moral rightness. During this time, people were more afraid of being labeled outsiders than they were afraid of the outsiders themselves (â€Å"A P†). Gender issues and the emergence of feminist consciousness are represented when Lengel states the rules that proclaim the girls are decently dressed-codingRead MoreAP by John Updike512 Words   |  2 Pages â€Å"AP† by John Updike is a story about a boy who learns that all actions have consequences. In â€Å"AP† three girls walk in to the store AP in nothing but their bathing suits. Sammy one of the stores cashiers describes what the girls are wearing and what they do throughout the story. The girls walk up and down the aisles catching the attention of many of the other customers. The girls then get in line at Sammy’s checkout, the manager Lengel walks up and tells the girls they will have to leave thisRead MoreA P By John Updike1033 Words   |  5 Pageshow we face these decisions will have an impact in our lives, and sometimes the ones that seem to be small are the most important ones. John Updike understood how making decision affects people’s life, and he develops it in his short story â€Å"A P,† which is the story of an unhappy boy who quits his job for a pretty girl. In order to develop this theme, John Updike takes Sammy, the main charac ter of the story, through three different stages. In the beginning stage, Sammy is just a boy who is not happy

Tuesday, December 31, 2019

Failure Of Software Project Failure - 2657 Words

Failure of Software Project : There are many reasons for the failure of the project here are the few reasons how there is a failure accourance for the software projects. â ¦  The first reason is no proper planning for the project. â ¦  No sufficent time â ¦  No sufficient budget â ¦  No good communication. â ¦  No proper testing â ¦  Not reaching to industry standards. No Sufficent time : The deadline for the project is decided before the project starts. As the deadline is given we start assuming that the sooner we start coding the sooner we will finish. This kind of apporach is always wrong. It is very importatnt to spend time for creating a good design for the product with out a proper design that leads for continious changes for the project. So when this happens there is no sufficient time because lot of time gets wasted. No Sufficient Budget : Many of the projects have low budgets based on their own requirments. When this happens everything slows down eventually and the quality suffers. No Good Communication : There should always be a good communication with development team ,the users and the customers. This one of the important thing for the success of the project. No proper Testing : When the product to be delivered in the moment the only thing that suffers is testing. All the testing is left pending untill the coding is done from the development team.So, this results the product with lot of bugs and custmer feel unhappy. Not reaching to industry standards : Conforming to industryShow MoreRelatedReasons For Software Project Failure Essay1131 Words   |  5 Pages 1 Introduction The software industry is one of the largest and rapidly expanding industries in the world. In less than a century the software industry market has grown from non-existent, into a multi-billion dollar industry. According to industry analyst Gartner, the size of the worldwide software industry in 2013 was $407.3 billion, an increase of 4.8 over 2012. Many companies invest into innovative IT projects with the intention to boost new opportunities for their businesses, increase their competitivenessRead MoreSoftware Engineering Project Failure889 Words   |  4 PagesThis report is about software engineering project failures. In this report, I will first examine the importance of a good software engineering manager to a project. Then, I will identify major reasons for software engineering project fails within the software industry. At last, some suggestion about reducing project failure rates according to the knowledge and best practices will be provided. Manager is essential to software engineering project There are nine project management knowledge areas:Read MoreIv.Proposed Model. This Section Introduced The Proposed1333 Words   |  6 Pagespredicting failure of agile software projects. The proposed model is composed of three parts: as shown below in figure 4. - Review recent papers to extract important of failure factors in agile software projects. - The proposed model uses multiple linear regressions to determine critical failure factors in agile software projects. - The proposed model uses fuzzy logic for predicting failure of agile software projects. Figure4. The Proposed Model for Predicting Failure of Agile Software Projects Read MoreQuestions On Advanced Software Engineering1032 Words   |  5 PagesASSIGNMENT-2 ADVANCED SOFTWARE ENGINEERING CSC-580-01 PROCESS as the word defines about some of the operations that has to be done in a proper order. for every task which we want to complete. Everybody needs to complete the task within time so that they make a process like a documentation, with the help of that documentation they can complete the task in the scheduled time. While coming to the software field, every team should follow a process, when they are developing a project. Maintaining a processRead MoreSoftware Development : Software Projects1001 Words   |  5 PagesAbstract— agile software development plays a very significant role in software projects. Agile software project is a refined approach to design and direct project processes. An agile project is finished in short sections called iterations. This paper introduces a survey of machine learning approaches for predicting failure of agile software projects. It reviews the uses of machine learning techniques such as fuzzy logic, multiple linear regression, neural ne twork, logistic regression and etc., forRead MoreAnalyzing The Following Compound Risk : Unstable Requirements With Tight Budget Will Likely Cancel The Project1499 Words   |  6 Pagesbudget will likely cancel the project. Discuss the dependencies that exist between the two risks. Communication is an important part of our everyday lives. Without communications skills, it is extremely difficult to preform many simple tasks. With one person describing to another the function to perform, there needs to be clear description of the task at hand. When dealing with software projects, it is imperative that the end user convey their requirements of the software to the developer. EffectiveRead MoreSoftware Reliability Of Software Standards1116 Words   |  5 PagesSoftware reliability is dynamic stochastic. Unlike hardware, software does not age, wear out or rust, unreliability of software is mainly due to bugs or design faults in the software. The exact value of product reliability is never precisely known at any point in its lifetime. The study of software reliability can be categorized into three parts: Modeling, Measurement improvement. Many Models exist, but no single model can capture a necessary amount of software characteristics. Software reliabilityRead MoreThe Affordable Care Act And Its Corresponding Implementation Of The United States Of America Government s Healthcare Marketplace1611 Words   |  7 Pageshave sought to provide possible responses and reasoning as to why the implementation of the project did not finish as expected. Factors contributing to the unsuccessful launch of the software has been attributed to problems with project management, staffing, implementation and technology which can be further broken down into several problematic areas such as the gathering of requirements belonging to the project management category and change management which is handled in the implementation stage. RequirementsRead MoreHow To Perform The Role Of A Team Leader?1533 Words   |  7 Pagesteam leader as needed with a proven ability to adapt to significantly different technology specialties. I specialize in failure cases and non-happy paths. Proven ability in trouble shooting and determined effort at root cause. KEY SKILLS/EXPERIENCE †¢ Diagnosis system design †¢ Software design of mini language †¢ Hardware Failure Mode and Effects Analysis †¢ Automated Software diagnosis †¢ Root Cause Analysis †¢ New Product Introduction and Service Rollout †¢ Critical Situation Management †¢ OrganizeRead MoreQuestions On Advance Software Engineering1655 Words   |  7 PagesAdvance Software engineering Midterm-1 Name : Sushma Manjunath Bharadwaj ID: 87298 1. What is a context diagram? Why is a context diagram important to software engineering? How does doing a context diagram improve the safety and reliability of the ultimate software project? (Min 100 words) Solution: Context diagrams are the diagrams that show relationship between the system and external entities. The external entities provide inputs and in turn get output from the system. It shows the connection

Monday, December 23, 2019

F. Scott Fitzgerald s The Great Gatsby - 1289 Words

When people think of the American Dream, they may think of glam and fame and a beach house on the coast. The American Dream is more or less a fantasy in which the dreamer achieves fortune and riches with their work (or lack thereof). People want to get rich quick, and they want to have everything they have ever wanted handed to them on a silver platter. The twenties in America, commonly known as the â€Å"Roaring Twenties,† were a prosperous time, and many people realized their own version of the American Dream during this period. The American Dream is one that many people want to achieve. However, F. Scott Fitzgerald demonstrates his true feelings about the American Dream in his classic novel, The Great Gatsby. Many characters in this story, such as Daisy and Tom Buchanan, Jay Gatsby, and Jordan Baker, found riches and happiness in materialistic things and people throughout this novel. This is the stereotypical American Dream that is associated with the twenties. In Fitzgerald’s eyes, the American Dream is dead, because no matter how happy a person seems to be or how much money they have in their bank account, misery is just around the corner. Firstly, the main character and narrator of The Great Gatsby, Nick Carraway, had his own version of the American Dream. He â€Å"†¦ wanted the world to be in uniform and at a sort of moral attention forever† (Fitzgerald 2). Nick came from a well-to-do family, who were farmers that own a wholesale hardware store. Although Nick travels to theShow MoreRe latedF. Scott Fitzgerald s The Great Gatsby974 Words   |  4 PagesPoverty in the Valley of Ashes: The Great Gatsby â€Å"This is a valley of ashes- a fantastic farm where ashes grow like wheat into ridges and hills and grotesque gardens where ashes take the forms of houses and chimneys and raising smoke and finally, with a transcendent effort, of men who move dimly and already crumbling through the powdery air† (Fitzgerald 26). In the novel, â€Å"The Great Gatsby,† the author F. Scott Fitzgerald, mainly depicted lives of the rich and their luxuries but also showed theRead MoreF. Scott Fitzgerald s The Great Gatsby944 Words   |  4 Pages423169 Prompt #4 No Comments Lim [f (x)] - 0 = ∞ ... The Limit as X Approaches Infinity Humans continually search for success. This success surfaces in forms such as fortune, fame, glory, et cetera. The American Dream encapsulates the ideals of the â€Å"New World,† bringing together not only the idea of limitless success, but also its newfound availability and encouragement for embracing the promise land. The Great Gatsby explores the American Dream and â€Å"the actual nature of this dream... the mannerRead MoreF. Scott Fitzgerald s The Great Gatsby1265 Words   |  6 PagesJay Gatsby and His Undying Love for Daisy Buchanan F. Scott Fitzgerald wrote The Great Gatsby in the midst of the roaring twenties, which was an age full of wealth, parties, and romance. Young people living in the 1920s were centered around wanting to find love so Fitzgerald, along with many other authors during this time period, focused his writing in The Great Gatsby on relationships and affection. Jay Gatsby, one of the main characters in the novel, is a very mysterious man, but there is oneRead MoreF. Scott Fitzgerald s The Great Gatsby1845 Words   |  8 Pages â€Å"You don’t write to say something, you write because you have something to say.† F. Scott Fitzgerald was one of the most remarkable writers of all time during the Jazz Age. He started to reach an accomplishment of success with This Side of Paradise and accomplished it with The Great Gatsby. F. Scott Fitzgerald’s novels take place back in the early 1900’s; he attempts to communicate knowledge to the elocutionist, in a sophisticated, but humorous way, that making it big is not uncomplicated. FurthermoreRead MoreF. Scott Fitzgerald s The Great Gatsby1720 Words   |  7 Pagesdriving force of evolution in humanity. It allows the aspiration of being able to do astonishing things, and proffers them prosperity in life. The Great Gatsby by F. Scott Fitzgerald delves into the American Dream and it’s demise. Fitzgerald focuses on the character of Jay Gatsby to materialize the false image that the American Dream created in the 1920’s. Gatsby is th e protagonist of the novel, and is famous for throwing massive parties regardless of the secret life that he lives. The narrator, Nick CarrawayRead MoreF. Scott Fitzgerald s The Great Gatsby1202 Words   |  5 PagesJay Gatsby and F. Scott Fitzgerald F. Scott Fitzgerald is an acclaimed American author, popularly recognized for his novel The Great Gatsby. In addition to his literary work, Fitzgerald is noted for his unstable personal life. Originally coming from a low-income background, he could not marry the woman that he first loved. Even when he met another woman, he had to acquire wealth to marry her; this drove him to publish his first novel. He married her shortly after. However, a couple years after, heRead MoreF. Scott Fitzgerald s The Great Gatsby1258 Words   |  6 Pages What Killed Gatsby? Love or Greed? To certain people, Gatsby’s death was a cruel and surprising conclusion to The Great Gatsby by F. Scott Fitzgerald. But there is still some mystery around the cause of Gatsby’s death. Upon meeting Gatsby for the first time, one can tell that he has an obsession centered around Daisy Buchanan, his old love, and was dead set on getting her back. Gatsby’s obsession with repeating the past is responsible for his death and Gatsby’s greed put him in a grave. FurtherRead MoreF. Scott Fitzgerald s The Great Gatsby1761 Words   |  8 Pagescould be the main focus of people who are going out on their own to create a family. However, F. Scott Fitzgerald took a different route in his most famous novel. Fitzgerald uses his book, The Great Gatsby, to show how the idea of the American Dream is slowly dying in the society he created. Although the American Dream was prevalent during the time The Great Gatsby took place in, F. Scott Fitzgerald went against the social norm of believing in this idea and revolved his novel around the idea ofRead MoreF. Scott Fitzgerald s The Great Gatsby1381 Words   |  6 PagesResearch Paper on F. Scott Fitzgerald’s The Great Gatsby F. Scott Fitzgerald’s The Great Gatsby portrays characterization corresponding with characters’ birthplaces, desires, and determination in order to devise their statuses. The narrator, Nick Carraway, is disparate from others due to the place he grew up which is exemplified when he moves to New York from the Midwest. Tom Buchanan satisfies his desire for love by having women in his life as well as his wife Daisy. Jay Gatsby and Daisy BuchananRead MoreF. Scott Fitzgerald s The Great Gatsby1894 Words   |  8 Pageslife. In the case of F. Scott Fitzgerald, this statement could not be truer. In fact, much of Fitzgerald’s most famous work feature plots that closely parallel events from his life (Lathbury 10). For example, his novel This Side of Paradise includes a young man who is rejected by the love of his life on the grounds of his social status. Zelda similarly rejected Fitzgerald for his social status at first. In comparison, it is not surprising that Fitzgeral d’s story The Great Gatsby takes place in the

Sunday, December 15, 2019

Contrasts in the Great Gatsby Free Essays

Tyler Simms Great Gatsby Essay Accelerated English 11 Mrs. Cameron F. Scott Fitzgerald constructed his novel, The Great Gatsby, by sculpting numerous situation and character contrasts together through out the novel to create and deliver a magnificent work of art. We will write a custom essay sample on Contrasts in the Great Gatsby or any similar topic only for you Order Now Although Fitzgerald contrasted numerous characters and situations through out the novel, there are three that are very pungent; the characters Tom Buchanan and George Wilson and Daisy Buchanan and Myrtle Wilson. Not only were there Character contrasts, there were also situations that Fitzgerald contrasted against each other. One of them was the contrasting of the concept of the Old Money life style and the New Money life style. Tom and George not only have physical contrast, they also have contrasting lifestyles as well. Among other things, Daisy is very statuesque and â€Å"up-in-the-air† where as Myrtle s pragmatic and â€Å"down-to-earth. † Fitzgerald uses the concept of Old and New Money to contrast lifestyles and characters in the novel. Tom is Old Money, which means he inherited all of his riches from at least two generations into his family and does not flaunt his money. George, on the other hand, is very low class and has to work to provide for himself and his wife, Myrtle, who is committing an affair with Tom. Aside from the money aspect, Tom is â€Å"†¦ a sturdy, straw haired man of thirty with a rather hard mouth and a supercilious manner† (Fitzgerald 11). It is also made clear by Fitzgerald that Tom beats his wife and Myrtle, giving him the element of being robust and controlling. George is a pushover from the time he is introduced until he makes a decision that ruins everything for some, and revised for others. Tom deceived George into believing that he is going to sell him a car, with no intention of doing so, but with every intension of seeing Myrtle. Not only is he a pushover, he is very gaunt with not even half the audacity of Tom. Tom’s audacity and ill temper hurt the people around him, particularly Daisy and Myrtle. Their personalities are very much apart from each other. Myrtle is a very forward-looking person who knows {text:soft-page-break} what she wants in life, she is endowed with a strong character and vitality which distinguishes her from Daisy. Daisy’s superficiality extends to her personality. She is fragile, unstable and a confused character. While talking to Nick she said: â€Å"†¦ I woke up with an abandoned felling and asked the nurse right away if it was a boy or a girl. She told me it was a girl, and so I turned my head away and wept. ‘Alright,’ I said, ‘I’m glad it’s a girl. And I hope she’ll be a fool-that’s the best thing a girl can be in this world, a beautiful fool† (Fitzgerald 21). They also married their husbands for different reasons. Myrtle says she married George because she thought he was a gentleman. She also thought he knew about good â€Å"breeding. † On the other hand, Daisy married Tom because rich girls had to marry into money and good social status. Marrying Tom, Daisy married into the Old Money life style. The people who live by the Old Money lifestyle inherited all of their riches from at least two generations back in the family. They also don’t flaunt their money with buying and having extravagant cars, houses, parties etc. Fitzgerald differentiates Old Money and New Money by placing them on separate sides of Manhattan. Old Money on East Egg and New Money on West Egg. Tom and Daisy live on East Egg and prefer small get-togethers. Tom and Daisy had a party and the only people who were invited were Nick and Jordan. Whereas Gatsby, who lives in West Egg and is New Money, has very extravagant parties every weekend. By seven o’clock the orchestra has arrived-no thin five piece affair but a whole pit of oboes and trombones ad saxophones and violas and cornets and piccolos and low and high drums† (Fitzgerald 44). The contrast of the two lifestyles along with the characters brings the novel to a whole new level of interest. It also makes the story more interesting. Any novel that contrast any two or more subjects from with in itself, such as two or more characters or different life styles, is ind eed a work of art. {text:soft-page-break} Works Cited Page Fitzgerald, F. Scott. The Great Gatsby. New York: Simon and Schuster Inc. , 1953. How to cite Contrasts in the Great Gatsby, Papers

Friday, December 6, 2019

Thanks giving Dinner free essay sample

Many people yearn for various types of holiday events. These events may be in the summer, fall, winter, or spring time. Some find carving a pumpkin exciting, others enjoy hunting for eggs delightful, and even wearing green to be suspenseful. Considering the fact these are very popular holiday events, there is one I enjoy the most. Thanksgiving dinner is my favorite holiday event, because I enjoy setting the table, reuniting with family members, and eating all the delicious food. First, to initially start this gathering, I enjoy setting the table while dinner is being cooked. Nevertheless, the preparation time takes about five hours. For years, it has been a tradition for me to set the table. First, I place the burnt orange table cloth on the Maplewood table. Then I get the dinnerware out of the china cabinet. After washing the silverware, plates and cups, I place them in the correct order on the table. We will write a custom essay sample on Thanks giving Dinner or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page Lastly, I set the centerpiece on the table for the final touches. The table is now ready to be eaten on. The process of setting the table helps me feel helpful, and it makes Thanksgiving one of the best holidays because that is one less thing my mother and grandmother have to worry about. Next, reuniting with my family members during holiday events is always breath taking. Around this time, the seasoned and the new family members, come around and give an update of the latest news. This is where all the emotions take place. Sometimes, there is laughter and maybe even crying, but at the end of the day, there is always joy. Therefore, I would never trade hearing stories that have been passed down throughout our generations. Some of the stories taught me lessons, while others made me proud. However, it leaves me with a smile on my face. For this reason, being reunited with my family makes Thanksgiving Dinner so rare because that is when the whole family gathers around instead of the immediate family. Finally, it is now time for me and my family members to eat all of the delicious food my grandmother has prepared. Each year my grandmother makes my favorite meal. As a matter of fact, she made it large enough for everybody to take a plate home. This meal consists of turkey, ham, macaroni and cheese, yams, and dressing. Her specialty is greens and cornbread. My grandmother also makes plenty of dessert. Even though I may be full, I reach for another bite, knowing my eyes are bigger than my stomach. After it is all said and done my stomach is happy. My grandmother’s cooking is just like a food paradise. I like the food at Thanksgiving more than the food at other holidays because it seems more as a feast than a regular dinner. To close, Thanksgiving dinner is my favorite holiday event because I enjoy setting the table. Also, reuniting with my family members brings joy to my heart. Finally, eating all the delicious food my grandmother prepared leaves me and my stomach with a big smile. Therefore, these are the reasons Thanksgiving Dinner is my favorite holiday event.