Saturday, April 25, 2020
Mondrian Essays - Art Movements, Modern Art, Painting,
Mondrian 'Everything was spotless white, like a laboratory. In a light smock, with his clean-shaven face, taciturn, wearing his heavy glasses, Mondrian seemed more a scientist or priest than an artist. The only relief to all the white were large matboards, rectangles in yellow, red and blue, hung in asymmetric arrangements on all the walls. Peering at me through his glasses, he noticed my glance and said: I've arranged these to make it more cheerful.' Thus Charmion von Wiegand on Mondrian's New York studio. In his Paris studio he had used flowers to make it more cheerful. One tulip in a vase, an artificial one, its leaves painted white. As Mondrian was probably incapable of irony, the tulip was unlikely to be a wry joke about his having had to produce flowerpieces between 1922 and 1925 when he no longer wanted to because there were no buyers for his abstracts. It could, of course, have been a revenge for the agony a compromise of that sort must have cost him. More likely, it was simply a part of the general revulsion against green and growth which made him, when seated at a table beside a window through which trees were visible to him, persuade someone to change places. The artificial tulip fitted in, of course, with the legend of the studio as laboratory or cell, the artist as scientist or anchorite. Mondrian felt it mattered that an artist should present himself in a manner appropriate to his artistic aims. A photograph of him taken in 1908 shows a bearded floppy-haired Victorian man of sensibility. A photograph of 1911 shows a twentieth-century technologist, cleanshaven with centre parting and brilliantined hair; the spectacles were an inevitable accessory. Soft and hairy becomes hard and smooth; one of the great landscape-painters of his generation, one of the great flower-painters of his generation, comes to find trees monstrous, green fields intolerable. The loneliness of the artificial tulip with its painted leaves might seem to suggest that flora were admitted grudgingly, one plant being the next best thing to none. But it probably meant the opposite of that - was probably a sign, not of Mondrian's having become a different person, but of his having remained the same. When Mondrian had painted flowers, he almost invariably painted one chrysanthemum, one amaryllis, one tiger lily. His most personal paintings of trees are paintings of one tree; of architecture, are paintings of a lighthouse or a single windmill or an isolated church - a solitary tower, often with its entrances as if blocked, like a fortress, refusing disruption of its monolithic intactness, its immaculate otherness, its self-sufficient singularity. Likewise the early romantic landscapes are rarely at all panoramic: they usually take in something like a couple of cows and a tree, three or four trees in a row, a group of farmhouses. And the tendency to concentrate attention inwards persists into the paintings and drawings of the sea Of 1914-15: half of them are of a Pier and Ocean. The ocean is not oceanic, consuming, illimitable: it radiates from a vertical motif representing a man-made projection - like the towers jutting into the sky. Only the composition is no longer centripetal. The pluses and minuses of the sea don't converge upon the pier: they do radiate outwards, are then checked by the containing oval within the rectangle of the page or canvas. These works are, of course, among the key transitional pieces between figuration and non-figuration in Mondrian. In the tensions they exhibit between centripetal and centrifugal, they are also representative of his transition from centripetal to centrifugal design. In Mondrian fi guration is equated with the centripetal, nonfiguration with the centrifugal. (It is interesting that an artist so exceptionally given to symmetry in his early days should so rigorously exclude it in his maturity.) Focusing inwards is rejected by Mondrian when the object is rejected. Focusing inwards is involvement. Involvement with objects entails suffering. In the paintings of chrysanthemums - that most centripetal of flowers - there is a sense of concentration that is agonising. It is as if the artist were trying to hypnotise himself by gazing into this flower and as if he were trying to hypnotise the flower into suspending its process
Wednesday, March 18, 2020
The Intellect And The Heart Essays
The Intellect And The Heart Essays The Intellect And The Heart Essay The Intellect And The Heart Essay Essay Topic: poem Messages from the soul that began by naming things, and which in time grew into still longer, more intricate stories, are still with us today. We call these messages the same thing we did in ancient times: poetry, which is itself derived from the ancient Greek root, poiein: to make. Not to write lines, meter, rhymes, stanzas, but simply to make something where there was nothing before. This is what makes them timeless. My experience with poetry has been not been limited, but to understand the essence of poetry took a long time. I understood poetry when I was in 11th grade in Pakistan, and ever since it has attracted me, especially spiritual poetry. My first encounter with it was a poem by a very famous poet, Dr Mohammad Allama Iqbal. His poem The Intellect And The Heartà had an immediate impact on me. Poetry is a very basic and essential form of human art, which is why we all can relate to it. When reading or writing poetry we instinctively know that something profound has occurred. When our own poems come to us, we treat them as sacred events. No one has to tell us to do that, we automatically do it, because every fiber of our being knows we have received something similar to grace, that the soul itself has spoken to us, and for us. Similarly through this poem The Intellect And The Heart I have learned what i would have taken years. During reading this poem it dawned upon me that knowledge does not lead to the comprehension of the Essence of God. The heart guides one to the final goal. Before reading this poem i had to read about the poets life and the influence under which he wrote it. In this particular poem he has tried to explain the concept of understanding God. What struck me while reading this poem was that through his use of Intellect and Heart (Intuition) he has tried to explain the controversy of the relative efficacy of these two means of knowing the truth about the existence and the essence of God and His relationship with the universe, both material and spiritual. I was surprised my self to reach this idea while reading it as this very controversy is a part of every Muslim life. This poem gave me another aspect of searching God. Not through the human eyes but with an understanding and devotion. To understand the existence of God we have to look with in our own self and have to look with all intelligence and love towards God for the purpose of finding him. This in itself is an accomplishment for us. This is the very message that I got from this poem. It had a very positive experience and i was in a phase of judging Gods existence without even looking for him. In his poem the poet has used Intellect (Knowledge), reasoning and logical thinking synonymously for ways of acquiring the knowledge of the material universe. The ways depending upon the above faculties are the material ways of experimentation and reasoning. Similarly, he has used Heart, Intuition, and love of God, faith, belief in the realities of the unseen or transcendental universe, based on revelation, synonymously for the means of acquiring knowledge of the spiritual universe. In the matter of the controversy of Intellect and Intuition he has recognized two different situations in one of which Intellect gets precedence over Intuition and in the other the precedence is reversed; for example Learning is from you, but Divine Knowledge is from me You only seek Divinity, but showing Divinity I am. I noticed that here the poet has acknowledged that brain or Intellect is the source of learning but the divinity can only comes from heart. I also noticed that through this method of poetry he has tried to show that such heavenly knowledge cannot be achieved through Intellect or commitment alone. These two forces have to work side by side as a system in order to achieve a full understanding of God. This system has been discussed in many books, but i felt more attracted and moved by this poem as it had answers many questions regarding the role intelligence and beliefs. Similarly Iqbal also said that Concerned with the manifest order you are and acquainted with the inward I am The other aspect if this poem came to my understanding when i researched the time, place and influence this poem was written in. To completely understand the message of this poem we have to understand, that at that particular time the Muslim nation was going through a rough part of history. This poem addressed two aspects of Muslim life. One is about the Divine knowledge and the other is the renaissance and rejuvenation of the Muslim world and Muslim society so that it may regain its lost position in the world community, through the dual task of inner reconstruction and outer adjustment to the changed conditions of the present day world. Which require Intuition as well as Intellect. The latter has precedence over the former. Thus the poet has addressed two problems faced by Muslims all over the world. Seeing the poem in a different perspective i came to know that these both goals can be achieved only, if we devote our selves fully to God, which would in turn also strengthen our nation. This poem contains two messages hidden in each other and shows that a perfect harmony dose exists between our heart and mind. Which is that through knowledge (INTELLECT) and devotion (Intuition) we can achieve inner peace as one needs inner peace to search his soul and then see the world through a learned eye, only and only then the mysteries of world will be solved and God can be found present in every aspect of nature. This is the final message i received from this poem. I like it because it explains the complex relation of intelligence and intuition and that it must co exists. Where Intellect will slowdown Devotion or Intuition will take over as Intuition is the guide and intelligence is the engine and this relation ship is like a machine which will enable us to find our way towards an understanding of Gods existence and the mysterious ways in which he works.
Monday, March 2, 2020
Common Mistakes in Grammar to Be Careful About
Common Mistakes in Grammar to Be Careful About Common Mistakes in Grammar to be Careful about in Writing 1.à à Youââ¬â¢re vs. Your Beginning with the basics is important. Notably, this is a mistake in grammar that students and academics should not be making while at the undergraduate educational level. Nevertheless, also some of the advanced writers of essays are remorseful of this error of grammar, only because they fail to go through their work again. The following is the difference between ââ¬Ëyouââ¬â¢reââ¬â¢ and ââ¬Ëyourââ¬â¢: Youââ¬â¢re simply a shortened verse of the word you are Yours happens to be a possessive pronoun If a person is ever having difficulties to choose the word to use between the two, lengthen the compressed youââ¬â¢re. For instance, ââ¬Ëyouââ¬â¢re a garden is lovely,ââ¬â¢ is not correct since it implies you are a garden is lovely. 2.à à Their vs. There This is an error in grammar that ought to have been cleared out at auxiliary school. The standard itself is usually seen, so this incident seems most normally as an error. There can be utilized from various perspectives: as a source of perspective to a place we should go there, or as a pronoun there is no way. ââ¬ËTheirââ¬â¢ is a plural possessive pronoun, as in their cakes or their sentiments. In this way, in case youre discussing more than one individual and something they have, utilize their unfailingly. 3.à à Tenses Tenses are a typical grammatical mix-up in papers paying little mind to the dimension of study. When in doubt, in case youre referencing a persons feeling (whos as yet alive) ensure you utilize the current state for example Fleming says as opposed to Fleming said, as the last make their perspectives sound increasingly dated. A few students additionally will, in general, compose the prologue to their exposition later on tense for example in this exposition I willâ⬠¦ instead of in this article, I am going toâ⬠¦ which makes the paper sound progressively certain and self-assured. 4.à à Hypothetical Circumstances While examining speculative circumstances, which you much of the time do when advancing hypotheses and sentiments in college expositions, dependably utilize the words were and would. Even though somewhat more progressed than our past precedents, this is as yet a typical misstep that could antagonistically influence the meaningfulness of your article. Beyonce and Gwen Stefani have done everything they can to enable us to recollect this essential guideline with their melodies If I was a rich young lady ââ¬â inaccurate, and On the off chance that I was a kid ââ¬â right. 5.à à Parallel Lists For coherence, things in a rundown ought to dependably be in the parallel frame, which implies every section in the rundown is organized similarly. For instance: He was content with his sprinting, shooting, and his spilling ââ¬â Incorrect He was content with his sprinting, shooting, and spilling ââ¬â Correct He was content with his sprinting, his shooting, and his spilling ââ¬â Correct
Friday, February 14, 2020
Immigration Essay Example | Topics and Well Written Essays - 250 words - 6
Immigration - Essay Example Barring some religious differences between catholic and protestants, they were accepted more readily within the American society as against Chinese immigrants. The Irish and German immigrants in America were conspicuous in their attitude towards work. The German immigrants were endowed with more money and therefore sought land and work in farmland. There were also politically active and endorsed the ideology of democrats who believed in equality and in the welfare of the commoners. The Irish immigrants, on the other hand, were driven to America due to poverty and scarcity of opportunities in their motherland. Most of the were employed in labor intensive work like construction of road, canals, bridges etc. But both, German and Irish immigrants faced huge opposition because they threatened the livelihood of Americans in low paying jobs. Most importantly, German and Irish immigrants showed that America remained the most attractive place to realize oneââ¬â¢s dream of prosperous and happy
Sunday, February 2, 2020
Building and Sustaining Strategy Essay Example | Topics and Well Written Essays - 1250 words
Building and Sustaining Strategy - Essay Example Establishing good customer relations has helped learn the importance of feedback in the business (Langdoc, 1998). The feedback reception helps an entrepreneur to plan and make necessary changes in the product and services approaches. Innovation is a very important part of building and sustaining strategy. As an entrepreneur I have also learnt the basic skills of nurturing an innovation protecting it and making the best out of it. For any business to be successful there must be a good communication network. Lack of feedback was major issue at the organization (Coyle, 2003). The management never responded to the points of concerns raised by employees. Effective feedback usually helps in dealing with the emerging challenges. The management is the policy translator to the employees and therefore continuous feedback should be available. I have also been able to learn the importance of good communication with other employees. The proper communication network helps in solving problems that we may encounter while conducting business. Good communication is also important with the customers (Business Forecasting, 2011). Management is a continuous process of synchronizing an organization with its market throughout while tackling the competitors and regularly collecting feedback within the organization itself (Buchanan, 2000). It examines external and internal factors affecting a particular organization together with the skills, information and strategies put in place to effectively manage the change and consequent improvements. I have a feeling that management is an effective tool for decreasing motivational and environmental constraints while improving organizational structure. I learnt that lack of organized information (lack of an integrated framework) in an organization is a potential drawback. Organizations have departments, which at most times cause distortion of information hence influencing the decisions made by the executives. Information in an organization can b e organized in a process-based manner (Pitak, 2000). The process-based manner ensures that the organization is viewed horizontally regardless of the departmental boundaries. In addition, intangible (making of decisions, leadership, and innovation) and tangible should be Organization communication is the movement of knowledge and information amongst people in the organization in order for efficiency and effectiveness to be attained. Both the management and staff should share the goals of the organization. In the past, application aspects (writing and speaking) were the major concerns of communication but it later changed to character-based aspects. Since that time, organizational communication has developed and undergone various modifications. When changes or challenges occur in an organization, ways and means are identified to counter the changes effectively spread equally within the organization fraternity. For any entrepreneur the ability to maximize and optimize profits is an ess ential part while building and sustaining strategy. Application There is need for development of an overall plan on the integration of the various departments and staff. The management should insist on teamwork and establish an environment within the company that practices respect and diversity. The management should make a decision on the points of responsibility interdependence by assessment of the joined responsibilities. After
Friday, January 24, 2020
Hamlet: The Man behind the Madness Essay -- ophelia, shakespeare
What drives Hamlet to his madness? How does it relate to Opheliaââ¬â¢s madness? Are Hamlet and Ophelia both truly mad? These are some questions that I contemplated as I read Hamlet. The main character, Hamlet feigns madness after learning of his fatherââ¬â¢s murder; however, he becomes mad later on in the play. Is it possible that Hamlet became so wrapped up in his fatherââ¬â¢s murder that he was unable to distinguish fantasy from reality? At the beginning of the play, Hamlet has learned that his brother, the newly king, Claudius, murdered his father. In Christian Wertenbaker: What is the riddle in HAMLET? (Sirs.com, 2011) it is stated, ââ¬Å"From then on, Hamlet has to find his own way. He has become a seeker of truth. Unless he verifies the facts for himself, he cannot do the actâ⬠(1). This shows that Hamlet canââ¬â¢t back away from what he is meant to do. In his eyes he sees himself as being chosen to avenge his father. In fact, Hamlet proclaims, ââ¬Å"The time is out of joint. O, cursed sprit, That ever I was born to set it rightâ⬠(I. V. 207-208)! Already Hamlet is stressed out by his misfortune. He sees no other option, but to kill his uncle. After his meeting with the ghost, Hamlet becomes obsessed with death. It is obvious that Hamlet is wrestling with the idea of whether or not he can commit the act. At this point he is capable of reasoning, but prior to this he was wily enough to invent his false madness. He has not lost his ability to discriminate right from wrong; therefore, he is not mad. To be mad a person loses total reasoning. Still he is determined to discover whether or not Claudius did really murder his father. So, Hamlet organizes a play that reveals the truth about his fatherââ¬â¢s death. This play serves as a strategy to force Claudi... ...f action have been eaten up by thought, he to whom the universe seems infinite, and himself nothing; whose bitterness [75] of soul makes him careless of consequences, and who goes to a play as his best resource is to shove off, to a second remove, the evils of life by a mock representation of them - this is the true Hamletâ⬠(2). To me this means that Hamlet is what the audience or reader makes him to be. He is not mad, but a part of everyone. He is seen in the audience. This play contains a truth, the truth of life. Hamletââ¬â¢s character contains many feelings that are shared such as sorrow, dread, and lonely. For Hamletââ¬â¢s character lives through the reader. Works Cited Shakespeare, William. ââ¬Å"The Tragedy of Hamlet, Prince of Denmarkâ⬠Literature: An Introduction to Reading and Writing. Ed. Edgar V. Roberts. 9th Ed. New York: Pearson Longman, 2009. Print
Thursday, January 16, 2020
Project Report Cow Dairy
|Area Considered 27500 Sft. |Scope of work | |à |Civil and Interior Work | |1 |Dismantling of existing flooring | |2 |Brick work | |3 |Providing and laying brick wall with plaster finished with POP punning and including | | |plastic emulsion paint | |4 |Vitrified flooring in 2nd floor entrance lobby and 1st floor passage, waiting area, | | |reception area and cafeteria. | |5 |Vitrified tile flooring in toilet and vitrified tile dado in toilet and pantry. | |6 |Fire alarm systems with sprinklers. | |7 |Kota in store room. | |8 |Raised floor in Electrical room, UPS and server room | |9 |Granite toilet counter | |10 |Dry pantry counter in cafeteria. |11 |100mm & 75mm thick full height partition finished with plastic emulsion paint | |12 |Full height glass partition in main entrance lobby, conference room & meeting room. | |13 |Gypsum ceiling & acoustic ceiling | |14 |Doors: 12mm toughned glass with ozone make hardware and 38mm laminate finish flush door | | |with ozone fittings. | |15 |Built in furniture: Full height storage made out of commercial ply with 1mm thick | | |laminated shutter, overhead storage made of commercial ply with laminate finish. | |16 |Loose Furniture: Reception table with corian top and laminate on inside with pedestal | | |unit. | |17 |16 seaters and 10 seaters meeting room table with laminate finish. |18 |Security table | |à |Electrical work | |à | Design, fabrication,supply and installation of main LT panel board, capacitor control | | |panel, lighting distribution board, power distribution board, UPS distribution board, | | |power cabling, control cabling, wiring in conduits, lilghting with lighting fixtures and | | |appliances. Cabling, telephone cabling, Floor trunking and cable tray. | |à |HVAC | |à | Ductable 50 tones split AC with grills and defusers and duct insulations with electrical | | |cabling. |à |Carpet | |à | Rest of the floor will be carpet flooring. | |à |Blinds | |à |Blinds in external wind ows | |à |Signage: | | | Signageââ¬â¢s in toilet. Meeting room, fire fighting staircase etc. | |à |Network Cabling | |à | 2 data and 2 voice point in each work station and 4 data and 4 voice point in each | | |conference and meeting room. |à |UPS | | |Required capacity of UPS battery with racks. | |à |AV Equipment-LCD/Projecter, | | |Polycom Phones | |à |LCD in conference room and cafeteria, polycom phone in conference room. | |à |Furniture | | |65 Linear work station in laminate finish. | |à |All Chairs (Except work station chair and meeting room chairs )in cafeteria and sofa for | | |reception. |à |Office Equipments | |à |Office Equipments: 230 Ltrs Refrigerators, door mate and steel dustbin. | ââ¬â Required Scope of services : 1. Design Services:- Interior design of office fit out covering space planning , interior layout , furniture fixtures , false ceilingà (with minimum modifications possible), partition , carpentry etc. Prepare and p resent final design development plans and details, fixing dimensions and describing in details the interiors , mechanical , electrical ,à à IT, à AV and lighting solution. 2. Fit -out Management:-à Project Management of the fit-out works including submission of design to handing over of facility . 3.MEP Consultant :- Design of all services like UPS , Electrical ,à HVAC , IT Network , Security system & AV equipment . 4. Fit out work :- Providing , Supplying & Installation of Civil interiors , Electrical , HVAC , Modular furniture's , Chairs (excluding workstation and meeting room chairs) , Carpet , Blinds , AV equipment , UPS , IT networks , Signage's/Graphics & Office equipmentà as per approved design. for spaces including (but not limited to) Workstation Area, Reception Area, Server Room, UPS Room, Meeting Rooms,à Cafeteria, Dry Pantry, Quite Rooms, Reprographics cum Stationary Area, Store Room, Electrical Room etc. Please refer the attached scope of works (specific ations and Proposed Plan) forà à further detailsà . |S. No. SPECIFICATION ââ¬â CIVIL & INTERIOR | |A |CIVIL & WET WORKS | |A-1 |DISMANTLING | |1 |DISMANTLING OF FLOORING :- Dismantling of existing flooring and skirting including removing | | |base in cement mortar of any depth etc. and disposal of unserviceable material to the closest| | |dumping ground. | |2 |DISMANTLING OF BRICK WORK :- Dismantling of brick wall of all thickness in cement mortar, | | |including glazed tiles, cement plaster and disposal of unserviceable material as directed. | |3 |DISMANTLING OF RCC :- Dismantling of RCC work in lintel, beams, counters, slabs etc. including| | |cutting of reinforcement steel and disposal of unserviceable material as directed to municipal| | |dumping ground. |4 |DISMANTLING OF DOOR FRAMES & SHUTTER :- Dismantling of existing door frames and shutters and | | |stacking of serviceable material and disposal of unserviceable material to nearest municipal | | |dumping ground.. | |5 |MAKING CUT OUT IN SLAB/Wall :- Making cutout in slab upto to size of 0. 5 sqm including cutting| | |reinforcement and making good all opening for other allied works as directed. | |A-2 |MASONRY AND PLASTER | |1 |CLOSING OF CUT OUTS :- Closing of cut out in cement concrete and fixing of PVC sleeves as | | |directed. |2 |REPAIRING OF FLOORING:- Repairing of existing flooring of approximate width 150- 300mm taken | | |as average and 50mm deep in cement concrete 1:2:4(1cement : 2 coarse sand : 4 graded stone | | |aggregate) mixed and finished with cement mortar plaster 1:4 (1cement:4 coarse sand) etc. | | |complete as directed by the Architect. (for race way) | |3 |HALF BRICK WALL :- Providing and laying half brick partition wall with well burnt good quality| | |of first class designation 75 in cement mortar 1:4(1cement: 4 coarse sand) including providing| | |2 Nos of 6mm dia MS round bars at every IV th course, including scaffolding, curing rubbing | | |the surface, racking out joints etc. omplete as directed and specified for walls, at all | | |floor and levels, including 12 to 15mm thick cement plaster in 1:4:2(1cement:4 fine sand : 2 | | |coarse sand) | |4 |230MM THICK BRICK WALL :- Providing and laying 230mm thick brick wall with well burnt good | | |quality , class designation 75 in cement mortar I:4 (1cement:4 coarse and) including, | | |scaffolding, curing, rubbing the surface, racking out the joints etc. completed as directed | | |and specified for walls, at all floor and levels. | |5 |CEMENT PLASTER :- Providing and laying 12to 15mm thick cement plaster of mix 1:4:2( 1cement:4 | | |fine sand: 2 coarse sand) to all type of RCC work in line , level and plumb including smooth | | |cement finish as directed including providing necessary bands, drip moulds groove and wiremesh| | |at all junction of walls and ceiling including racking the joints or roughening the RCC | | |surfaces, necessary curing scaffolding etc. complete as directed and specified. |6 |REINFORCED CEMENT CONCRETE :- Reinforced cement concrete work with M-20 grade reinforced | | |cement concrete in lintels, beams counter, shelves including the cost of centering and | | |shuttering finishing and reinforcement at all height & levels | |7 |CEMENT CONCRETE UNDER FLOOR :- Providing and laying cement concrete under floor etc. at all | | |levels including the cost of centering, shuttering , finishing etc. complete | |* |1:4:8(1cement: 4 coarse sand: 8 graded stone aggregate 20mm nominal size) | |8 |POP Punning (6mm-12mm): Providing and fixing Average 6mm to 12mm thick POP Punning over cement| | |plaster in line & plumb finished smooth to receive paint. | |9 |POP Punning (25mm-30mm): Providing and fixing Average 25mm to 30mm thick POP Punning over | | |cement plaster in line & plumb finished smooth to receive paint. |10 |WATERPROOFING WORKS :- Providing and applying water proofing treatment to toilets, pantries | | |and other wet areas base and walls with four coats of Ta pecrete or approved equivalent mixed | | |with white cement in proportion 1:2( 1tapecete: 2 white cement) including mixing silica sand | | |in second coat in proportion 1:2:1. 5(1tapecrete :2white cement :1. 5 silica sand) and sealing | | |all junction corners and concrete after first coat with epoxy mortar as per approved | | |specifications of specialist agency. | |11 |Providing and laying on sunken areas light weight concrete of approximately 600 kg per cum | | |density laid, consolidated, cured, finished, smooth, including finishing and grouting with | | |water proof cement mortar and as per specification. |12 |Providing and applying Ardex HydrEpoxy -300 (Damp proofing Membrane) in two coats on walls, | | |floors as per Ardex directions & specification and as per Architects approval. (Server/UPS | | |room) | |A-3 |PAVING AND WALL CLADDING | |à |à | |1 |VITRIFIED TILE FLOORING (white colour) :- Providing and laying mirror polished 592x592mm | | |vitrified floor tiles of E uro make laid over adequate thickness of cement mortar | | |1:4(1cement:4carse sand) using chemical grouting aquamix/ laticrete grout 5mm, plastic | | |spacers Tile adhesive unitile make.The rate shall be inclusive of necessary preparation, | | |cleaning, protection with POP etc. complete (BR of tile to be taken as Rs 80/sft) | |5 |VITRIFIED TILE DADO (white colour) :- Providing and laying mirror polished 600x600mm | | |vitrified tile dado at Toilet and Pantry of Euro make laid over adequate thickness of | | |cement mortar 1:4(1cement:4carse sand) using chemical grouting aquamix/ laticrete grout 5mm,| | |plastic spacers Tile adhesive unitile make. The rate shall be inclusive of necessary | | |preparation, cleaning, protection with POP etc. omplete ââ¬â (BR Rs 80/sft) | |6 |WALL TILES :- Providing and fixing 200x200mm ceramic tiles of Kajaria make shade as approved | | |by the Architect with balendura grouting, plastic spacer, tile adhesive , chemical grout of | | |balendura or e quivalent laid over 12mm thick cement mortar 1:4(1cement:4 coarse sand) | | |including cutting of tile in proper shape and size all complete as per design and drawing. | | |(B. R 35Rs/Sft) | |7 |ANTI STATIC VINYL FLOORING :- Providing and laying 2mm thk 600Ãâ"600 tile PVC antistatic vinyl | | |flooring of approved shade and quality with adhesive, as per manufacturers recommendation and | | |specification etc. complete Cost of leveling as required to be included in the quoted rate. (LG| | |floors or approved equivalent) (BR 145/Sft) | |8 RAISED FLOOR :- The entire access floor system shall be made from steel cementitious infill | | |and provide for adequate fire properties, acoustic barrier and air leakage resistance. The | | |system shall be able to withstand a UDL of 1200kg. Per sqmt. And a point load of 360 kg. The | | |pedestal shall withstand Axial Load of 2200kg. | |à |PANELS: -Panels shall be made from steel. The bottom of the panel shall be embossed in | | |hemispherica l shape to give strength and flexural rigidity. The top sheet shall be plain and | | |resistant welded at various locations after the top and bottom sheets have been degreased and | | |phostated to form a single composit unit.The entire panel shall be quoted with epoxy coating | | |on the exposed surface and then the hollow panel shall have an infill of light weight | | |cementitious material, panel shall remain flat through and stable unaffected by humidity or | | |fluctuation in temp through out its normal working life. Panel shall provide for impact | | |resistance top surfaces minimal deflection, corrosion resistance properties and shall not be | | |combustible or aid surface spread of flame, panels shall be insulated against heat and noise | | |transfer. Panels shall provide qualities of concrete slabs, panels shall be of size 600x600mm | | |and 30 ââ¬â 37mm thick fully interchangeable with each other within the range of a specified lay | | |out. Panels shall be free standi ng onto the structure. |à |Pedestal ââ¬â Pedestals installed to support the panel shall be suitable to achieve a | | |specified floor height from the existing floor level and shall be placed 600mm distance in | | |both directions to form a grid of 600x600mm. Pedestal design shall confirm speedy assembly and| | |removal for relocation and maintenance. Pedestal base shall be permanently secured to position| | |on the sub floor mostly by effective glue of mechanical fastening for more than 600mm | | |finished floor height. Pedestal assembly shall provide for easy adjustment of levelling and | | |accurately align panels to ensure lateral restrain. or prevention of corrosion pedestals are | | |either powder coated or zinc electroplated as required. Pedestal shall support an axial load | | |of 2200kg. without permanent deformation and an ultimate load of 3500kg. The pedestal flat | | |head then shall receive the panel which shall be fastened by screws to the pedestal head to | | |f orm a rigid grid. (UNITILE/CANI-MICROTAC) | |* |300 mm high with high abrasion anti- static HPL in size 600x600mm. | |9 |TOILET COUNTER :-P/F 450MM deep clear granite counters @ Toilets, rate shall be incl. of 20mm| | |thk granite 200mm deep 20mm thk granite front fascia; 75mm thk. :2:4 RCC counter slab duly | | |cured; cutting & creating holes in slab & stone ; bull nosing in stone ; Include necessary | | |preparations, cleaning & protection w/ polythene & POP as required; all as per design & | | |Architect's approvals. (B. R. 160 per sft) | |10 |PANTRY COUNTER :-(2400X2100mm) Providing and fixing pantry counter 350/700 deep over head and | | |under storage with granite top and 200 high back splash, 600X600mm vitrified tile | | |cladding,over head and base cabinet made of laminated shutter of 20mm BWP board . All internal| | |surfaces to have balancing laminate.The rate inclusive of necessary hardware,140 HIGH D | | |shaped Hetitch handle code no 011869 lock sets, self closing hing es, spring loaded shutter, | | |latch inside, all cabinet hardware to beâ⬠HETTITCHâ⬠or equivalent complete as per Architects | | |approval. (BR to be taken as Rs 160/sft) | |11 |PERIMETER GLAZING CILL/LEDGE :-Providing and laying , laminated cill/ ledge comprising of | | |1mm thick laminate over 19mm thick commercial board with 32Ãâ"12 beech wood lipping and clear | | |transparant silicon sealant at junction with wall and glass. all complete as per design and | | |drawing. | |* |150 wide with moulding at window level. |12 |STEPS IN SERVER & HUB ROOM:- Providing and fixing in position steps in server room made of | | |hard wood frame work of 75Ãâ"75 section laid to receive 19mm thick commercial ply to be screwed | | |to the hard wood frame work complete as directed. | | |à | |B. |DRY WORKS | |à |à | |B-1 |PARTITIONS AND WALL CLADDING | |à |à | |1 |FULL HEIGHT GYPSUM PARTITION (100MM THICK) :- Providing and fixing 100mm thick gypsum board | | |partitio n comprising of 48mm proprietary vertical studs , Two layer of 12. mm thick gypboard | | |on both sides of 48mm GI studd as per manufacturers specification (ââ¬Å"India Gypsum makeâ⬠) | | |including 50mm, (24 kg/cum) thick glass wool insulation of UP Twiga make grade specified by | | |the Architect from raw floor to the bottom of ceiling (Rate to be inclusive of GI corner | | |beads, hard wood scantling and other GI accessories finished with proprietary topcoat) | | |(including plastic emulsion paint) | |2 |Item same as above of 100mm thick gypsum partition but with hard wood framing instead of G. I | | |proprietary channel/ stud. | |3 |Item same as above of 100mm thick gypsum partition but above false ceiling. | |4 |PROVIDING ADDITIONAL LAYER OF:- | |a |Extra for providing single layer of MDF board in place of single layer of gypsum board) | |b |Extra for over and above of Item 1 for providing additional layer of 8mm+4mm thick MDF board| | |screwed/ nailed on one side of par tition. |c |Extra for over and above of Item 1 for providing & fixing additional layer of 12mm thick BWP | | |ply screwed/ nailed on one side of the partition | |d |Extra for over and above of Item 1 for providing additional layer of 12mm thick bison board | | |screwed/ nailed on one side of the partition | |e |Extra for over and above of Item 1 for providing and fixing 1mm thick laminate pasted over 4mm| | |thick MDF board over 8mm MDF board glued/ nailed with the existing partition. | |f |Extra for over and above of Item 1 for providing 4mm thick veneer duly melamine fixed over 8mm| | |thick MDF board glued/ nailed with the existing partition. | |g |Extra for over and above of Item 1 for providing extra layer of gypsum board nailed / screwed | | |with the existing partition. (without paint) | |5 |75MM THICK GYPSUM PARTITION :-Item same as above of 1 but with two layer of 12. mm thick | | |gypboard on one side only of studd all as per manufacturers specification (ââ¬Å"India Gyps um | | |makeâ⬠) (Rate shall be inclusive of GI corner beads, hard wood scantling and other GI | | |accessories finished with proprietary topcoat ready to receive paint. ) & closing of opening | | |made for duct and other piping work etc. (including plastic emulsion paint) | |6 |DUCO PAINTED PANELLING (62MM THICK):-Extra over 100mm thick partition for providing and fixing| | |MDF panelling fixed over 8mm + 4mm thick MDF board including metallic duco paint of (Belco | | |shade) as approved by the architect, including all hardware, ââ¬Å"Vâ⬠groove etc. complete as per | | |architects approval. |7 |132 THICK FIRE LINE BOARD PARTITION:-Providing and fixing 132 mm thick fire line partition two| | |layers of 15mm thick fire line board on both side of 70mm studs as per manufacturers | | |specification (ââ¬Å"India Gypsum makeâ⬠) including Vapour barrier and mineral fibre wool | | |insulation from raw floor to bottom of ceiling. Complete as per manufacturers specification. | |8 |110 THICK FIRE LINE BOARD PARTITION:-Providing and fixing 110 mm thick fire line partition two| | |layers of 15mm thick fire line board on both side of 48mm studs as per manufacturers | | |specification (ââ¬Å"India Gypsum makeâ⬠) including Vapour barrier and mineral fibre wool | | |insulation from raw floor to bottom of ceiling. Complete as per manufacturers specification. |9 |WOODEN SKIRTING;- Providing and fixing 12mm thick and 50mm high beech wood skirting flushed| | |to wall/gypsum partition with wooden plugs including all necessary nails, screws melamine | | |polishing on exposed surfaces, fire retardant paint etc. complete as per design and drawing. | |10 |VENEER PANELLING:- Providing and fixing veneer panelling made of hard wood framing fixed with | | |one layer 12mm thick MDF board & 8mm thick MDF board fixed/ pasted with 4mm thick veneer of | | |approved shade in batten form including making 10mm wide groove filled with metalic laminate | | |of Ventura make all hardware melamine polishing etc. complete as per architects approval. |11 |VENEER PANELLING:- Providing and fixing veneer panelling made of 8mm+ 4thick MDF board fixed | | |over hard wood framing pasted with 4mm thick veneer including making 4X4mm groove, all | | |hardware melamine polishing etc. complete as per NSN/architects approval. | |12 |WALL TRACTS FABRIC PANELLING:- Providing and fixing fabric panelling over hard wood framing | | |and MDF base and pinnable cellotex board to be installed as per design and drawing including | | |wall tracts channels, and 35mm wide laminated band at top andbottom complete as per | | |manufacturers specification. BR of fabric to be taken as Rs 500/rmt) | |13 |FABRIC PANELLING:- Providing and fixing fabric panelling over hard wood framing fixed with | | |fabric wrapped over 12mm cellotex board with 3mm cushion backing including all hardware, | | |fireretardant paint etc complete as per design and drawing. (Basic rate of fabric to be taken| | |as RS. 500/ meter) | |à |à | |14 |PROJECTED MDF POSTER PANEL:- Providing and fixing projected MDF panel pasted with laminate of | | |approved shade to receive the digitally printed graphic vinyl poster. |à |à | |15 |3M FILM OVER GLASS SURFACE:-Providing and fixing 3M scotchcal 3650-114 printed with 3M over | | |laminate 8952 with 5 yrs MCS warranty (By 3M India) over glass surface complete as per | | |approval of the Architect. (only film surface area shall be measured and paid) | |16 |3M FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M scotchcal 7725/324 over glass | | |surface with 15 yrs MCS warranty (By 3M India) as approval of the Architect. (only film | | surface area shall be measured and paid) | |17 |3M GRAPHIC FILM OVER MDF/GLASS SURFACE:-Providing and fixing 3M controltech comply with 3M | | |over laminate digitally printed with 5 yrs MCS warranty (By 3M India) as approval of the | | |Architect. (only film surface area shall be measured and paid) | |18 |G LASS PANELING :- 6mm thick SaintGobain Lacquered glass fixed/pasted to BWP ply/MDF base | | |complete as per design and drawing. (only glass surface area shall be measured and paid) | |19 |GLASS PANELING :- 6mm thick SaintGobain Lacquered glass fixed/pasted to BWP ply/MDF base | | |with hard wood framing and SS surround complete as per design and drawing. | |20 |WALL PAPER:-Providing and fixing wall paper (Vinyl wall covering) of VESCOM, Orient quality | | |(Code 146. 2)distributed by Wall Tracts on POP/ Gypboard surfaces with suitable addhesive as | | |per manufacturers specification. (BR 140 sft) | |21 |EDGE PROTECTION PROFILE:-Providing and fixing 25Ãâ"25 wide GI edge protection profile of India | | |Gypsum make at all the corners of the wall/column as per Architects approval. | |22 |HARD WOOD FRAMING:- Providing and fixing 50mmx50mm hard wood framing in partition as vertical | | |and horizontal supports for overhead storage's, white boards, art works LCD screens etc. | | |incl uding fire retardant paint etc. omplete as per direction of the Architect. | |23 |DUCO PAINTED JAMB:-Providing and fixing 20X125mm thick Duco painted jamb fixed to the hard | | |wood framing and commercial ply with 4mm thick MDF board etc. complete as per approval. | |24 |SS CORNER EDGE PROTECTOR:- Providing and fixing 50Ãâ"50 SS angle edge protector with and wooden | | |steps all accessories as per approval of the Architect. | |25 |CORIAN COUNTER:- Fabricating, supplying and placing in position corian counter 550 wide made| | |of corain cladded over commercial board with facia supported with 80 dia SS legs of HETITCH | | |make height adjustable Code No. 46064 covered with commercial ply and laminate at bottom | | |as per approval of the Architects. (BR of Corian to be taken as Rs 750/sft) (at Cafeteria) | |26 |Aluminium Glazed partition having 10 mm tempered glass. Section of Aluminium shall be as per | | |manufacturer specification. Make ââ¬â Alloy / To be Proposed by Design er/Vendor basis Acoustics | | |and overall Aesthetic quality | |27 |Aluminium glazed partition with 6mm+6mm laminated glass with vinyle in between two glassess | | |. section of Aluminium shall be as per manufacturer specification. Make ââ¬â Alloy / To be | | |Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | |à |à | |à |Notes:- | |à |à | |* |1)All beech wood and veneer to be seasoned and melamine polished to shade as / architects | | |approval | |* |2) All stainless steel cladding work to be provided and fixed by Architect approved specialist| |* |3) All hardwood to be seasoned and painted with anti-termite and fire retardant paints. | |* |4) All partition to be erected from floor to the bottom of the ceiling (Ceiling ht. + 3900), | | |filled with sound insulated material, as specified & directed by the architect. | |* |5) All partition to be extended upto existing window mullions, when it comes in contact with | | |the existing window and to be airtight closed all widow edges to have 4 mm groove with silicon| | |fill. | |* |6) All openings for the cutouts for ducting/raceways/cables etc. in the partitions to be | | |closed & made air tight. |* |7) The rate shall be inclusive of GI corner beads, hard wood scantling and other GI | | |accessories finished with proprietary topcoat ready to receive paint and providing minimum 70b| | |sound barrier. | |* |8) All materials shall be as per manufacturers specification (ââ¬Å"India Gypsum makeâ⬠) and | | |insulation material shall be as manufacturers specification (ââ¬Å"UP Twiga makeâ⬠) | |* |9)Contractor to procure certification from manufacturer of sound insulativeness of partition. | |* |10) Rate to include for fixing of hard wood framing below false floor level as required. |* |11) Rate to be inclusive of GI corner protector angle of India Gypsum make. | |B-2 |CEILING & FLOORING | |1 |GYPBOARD CEILING :- Providing and fixing suspended false ceiling, which includes providing and| | |fixing GI perimeter channels of size 0. 55mm thick having one flange of 20mm and another flange| | |of 30mm and a web of 27mm along with perimeter of ceiling, screw fixed to brick wall/partition| | |with the help of nylon sleeves and screws at 610mm centers. The suspending GI intermediate | | |channel of size 45mm, 0. mm thick with two flanges of 15mm each from the soffit at 1220mm | | |centers with ceiling angle of width 25mmx 10mmx 0. 55mm thick fixed to soffit with GI cleat and| | |steel expansion fastene. Ceiling section of 0. 55mm thickness having knurled web of 51. 5mm and | | |two flanges of 26mm each with lips of 10. 5mm are then fixed to the intermediate channel with | | |the help of connecting clips and in direction perpendicular to the intermediate channel at | | |457mm centers. 12. 5mm tapered edge Gypboard (Conforming to IS- 2095-1982) is then screwed | | |fixed to ceiling section with 25mm dry wall screw at 230mm centers. Screw fixing is done | | |mechanically. |à |Finally the boards are to be jointed and finished so as to have a flush look which includes | | |filling as finishing the tapered and square edge of the boards with joining compound, paper | | |tape and two coats of primer suitable for Gypboard (as equivalent) extra frame work for | | |electrical fittings, A/C diffusers, and/or any other cutout, trap doors, wooden shadow battens| | |(hollock wood black enamel painted-25x40mm) at wall peripheries and ends, 12mm thick MDF board| | |for pelmet etc. complete including opening to be made for AC grills, light fittings, trap | | |doors etc. (The quoted ate shall be inclusive of suspenders at all heights) ( The rate to be | | |quoted including plastic emulsion paint) | |* For horizontal & vertical surfaces | |à |à | |2 |DOUBLE SIDE COVE LIGHT:- Providing and making double sided cove light in gypboard including | | |lastic emulsion paint. | |3 |SINGLE SIDE COVE LIGHT:-Providing and making single side cove lig ht in gypboard including | | |plastic emulsion paint. | |4 |ACOUSTIC CEILING TILE (WHITE) :- Providing and fixing of Armstrong Acoustical Ceiling system | | |with Dune Max Microlook edge Tiles with SILHOUTTEâ⬠grid and shadow angle of size 600x1600x18mm| | |laid on 24mm hot dipped galvanized steel suspension system.The tile should have thickness of | | |18mm and humidity resistance of 95% RH, average NRC 0. 7, sound attenuation of 20db, light | | |reflectance >84%. Thermal conductivity k= 0. 036 w/mk, colour white , fire performance 0/class | | |I (BS-476) Installation to comprise main runner spaced at 1200mm maximum centres. The last | | |hanger at the end of each main runner should not be greater than 450mm from the adjacent wall. | | |Flush fitting 1200mm long cross tees to be interlocked between main runner at 600mm centres to| | |form 1200x600mm module. Perimeter trim to be Armstrong wall angle of size 19x19x3000mm, | | |secured to wall at 450mm maximum centres. |5 |TRAP D OOR:- Providing and fixing trap door in false ceiling made of ââ¬Å"Novapan ââ¬Å"prelaminated | | |board , dead locks, lipping all around including all hardware, hinges etc. complete as per | | |design and drawing. | |6 |CEILING PELMETS;-Providing and fixing 19mm thick B. W. P pelmets with hard wood lipping and | | |fixied to ceiling with hard wood framing complete including painting. (as indicated in the | | |drawing) to take vertical blinds. | |7 |MOTORISATION SCREEN PELMET AT CEILING:- Providing and fixing motorisation screen pelmet of | | |size 150mm x150mm with hard wood and commercial board with edge lipping etc complete. | 8 |BACK PAINTED PLY:-Providing and fixing black painted 6mm thick commercial ply over hard wood | | |framing above pelmet as per Architects approval. | |9 |PROVIDING AND FIXING :- 6mm th. commercial ply backing on mineral fiber modular false ceiling| | |tiles to support light fitting, speakers, CCTV cameras, diffuser of grid work size with | | |necessary cut outs for the same. | |10 |AC GRILL PROTECTOR:- Providing and fixing 150mm wide, 4mm thick black painted commercial ply | | |behind AC grill to avoid visibility of the services above the false ceiling as per Architects | | |instruction. |B-3 |DOORS | |à |à | |* |All door frames to be braced from raw floor slab upto soffit of ceiling slab. All rates to | | |include requisite hard wood frame work to be provided below finish floor/false floor and | | |finished ceiling of supporting glazing section and floor springs. | |* |All 4mm thick veneer should be as per Architects approval & duly polished. | |* |All door fame to be seasoned best quality steam beech wood or duco painted as per | | |specification and Architects approval. |* |Flush door made out of boiling water proof kiln seasoned, styles, rails for minimum thickness | | |45mm & treated with preservatives as per IS:2002 | |* |All flush doors shutter lipping to be 12Ãâ"45 melamine polished white beech wood or duco pain ted| | |as per specification and Architects approval. | |* |All wood to be treated with anti-termite and fireretardant paint. | |* |Contractor to prepare sample of all door frames, shutters and glazing type for Architects | | |approval. | |* |Contractor to submit sample board for all hardware for Architects approval. | |* |All seasoned white beech wood & veneer to be duly melamine polished as per Architects | | |approval. | |* |All laminate to be 1mm thick as approved by the Architects | |* |Contractor shall provide all necessary protection of glass until handover. |* |All glass doors/windows to be 12/10mm thick clear float tempered glass with mirror polished | | |edges. As per specification | |* |Cost to include 3M frost film (Crystal Quality) | |* |Joints between glazing in door/ windows to have silicon sealants. | |* |Glass in patch fitting door/windows to be 12mm thick with clear float tempered glass with | | |mirror polished edges. | |* |Wherever shown powder coated extruded al uminium transfer grill size would be as per drawing | | |or as mentioned in the boq. | |2 |ED2 (1000X2100) ,12mm thick single leaf tempered glass door .The rate should be inclusive of | | |all hardware , OZONE make door handle 25Ãâ"1200 H shape 304 grade , floor spring FS9400, patch| | |lock OPL-1 , ceiling mounted door stopper, etc complete as per design and drawing. (Ent door) | |à |à | |3 |G1 (12670X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. |4 |G2 (7800X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |f itting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. ( touchdown cafe ) | |5 |G3 (6530X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling and 4 nos 50X200 mm duco painted wooden mullions as/app, The | | |rate should be inclusive of all hardware OZONE patch fitting, top patch OPF-2, bottom patch | | |OPF-3, OZONE make door handle 25Ãâ"1200 H shape 304 grade , floor spring FS9400, patch lock | | |OPL-1 , ceiling mounted door stopper all complete as per design and drawing. Touchdown | | |cafe ) | |6 |G4 (3300X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. (Meeting room) | |7 |G5 (2230X2100) Door/fixed glazing 12mm thick tempered glass fixed with SS U channel at | | |floor and inside the ceiling, The rate should be inclusive of all hardware OZONE patch | | |fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door handle 25Ãâ"1200 H shape 304 | | |grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted door stopper all complete as| | |per design and drawing. Meeting room) | |8 |G6 (3000X2100) Fixed glazing,12mm thick tempered glass fixed with Jeb Aerofoil/aero span | | |member fixed with SS U channel at floor and inside the ceiling, The rate should be inclusive | | |of all hardware OZONE patch fitting, top patch OPF-2, bottom patch OPF-3, OZONE make door | | |handle 25Ãâ"1200 H shape 304 grade , floor spring FS9400, patch lock OPL-1 , ceiling mounted | | |door stopper all complete as per design and drawing. (Collaboration) | |9 |D1 (900X2100) ,38mm thick single leaf laminated flush door . The rate should be inclusive of | | |all hardware , OZONE make door handle 25Ãâ"1200 H shape 304 grade , floor spring FS9400, patch| | |lock OPL-1 , ceiling mounted door stopper, etc complete as per design and | | |drawing. Pantry,store, Quite room) | |10 |D2 (1200X2100) Single leaf with vision panel (300Ãâ"300) with wired glass, access controlled | | |door of non metallic 50mm thick asbestos free composite fire & smoke check shutter comprising | | |of two non ââ¬â combustible boards 12mm thick sandwitching 20mm thick fire resistant filler of 2| | |hour fire rating resistance rating confirming to BS: 476 part-22 IS: 3614 suitable for | | |mounting on duco painted wooden frame of size 50X125 mm both side laminated, 2 hr. fire rated | | |vision glass panel with heat activated intumescent fire seal strip of size 12x4mm fixed on all| | |three sides except bottom and frame s hutter to be mounted with SS fire rated hinges with | | |necessary screws and one coat of anti termite fire resistant primer. Rate shall be inclusive | | |of all hardware OZONE make door handle 425 long OGH-55, OZONE door closer NSK 980 with track | | |arm and hold open function with SS cover, hinges, all complete as per design and | | |drawing. Server room) | |11 |(1800X2650) Double leaf Door comprising of 10mm thick toughened glass with Aluminium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |12 |(1200X2650) Single leaf Door comprising of 10mm thick toughened glass with Aluminium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia.Complete as per detail | |13 |(1000X2600) Single leaf Door comprising of 10mm thick toughened glass with Alum inium frame | | |of Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality | | |having stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |14 |(900X2600) Single leaf Door comprising of 10mm thick toughened glass with Aluminium frame of| | |Alloy / To be Proposed by Designer/Vendor basis Acoustics and overall Aesthetic quality having| | |stainless steel handle 1200mm long 32 mm dia. Complete as per detail | |C. BUILT IN FURNITURE | |1 |FULL HEIGHT STORAGE:- Providing & fixing Storage cabinets made out of 19mm commercial board | | |with 1 mm thick laminated shutter in facia and balancing laminate all inside adjustable | | |laminated shelves,50X12mm veneered finish band alaround, 20mm laminated groove, 50mm high | | |laminated skirting. Rate should be inclusive of necessary Hardware- 140high D shaped Hetitch | | |handle code no. 011869, Lock sets, self-closing hinges, spring loaded shutter latch inside, all| | |cabinet hardware to be HETITCH make & as/Architects approval. | |2 |ELECTRICAL D. B. CUPBOARD:- Providing & fixing cupboard for D. B. panel cabinets comprising | | |shutters constructed from 20mm thick. comm. board finished in 1mm thick. laminate. and | | |balancing laminate inside, carcass constructed from 19 mm thick.Bison Board all inside, | | |12Ãâ"50 wooden band alaround, with 20mm groove, Provide 150Ãâ"300 powder-coated aluminum louvered | | |grills on each shutter, requisite cutouts for ventilation above and servicing trap door below. | | |Rate should be inclusive of necessary Hardware- 140high D shaped Hetitch handle code no | | |011869, Lock sets, self-closing hinges, spring loaded shutter latch inside complete as per | | |Architects approval. | |3 |Fax Printer Counter SIZE( 3490X2100) :- unit to include base cabinet, overhead cabinets, | | |pinup boards in fabric and 12mm thick tempered glass cladding pasted with 3M digitally printed| | |graphic film fixed with SS studs.Base cabinet to have wire dump channel with brush & OH | | |cabinet to have lighting pelmet as shown Constructed from best quality water proof board / | | |plywood. Top to be manufactured out of 25mm thk HPL post formed MDF board. and 200 high | | |laminated finish band. All over head shutters to have laminate outside and counter-laminated| | |inside, partitions and shelves to be finished with 1mm thk. laminate on all sides, BR of | | |fabric to be RS 500/- per Rm. The rate shall be inclusive of all hardware- 140 HIGH D shaped | | |Hetitch handle code no 011869, self-closing hinges, spring loaded shutter latch inside,, | | |complete as per architect's approval. |4 |VENDING COUNTER SIZE (2915X2100) :- Providing and fixing break out vending counter includes | | |under counter storage , vending counter made of 40mm thick corian top over BWP,200 high corian| | |back splash,base cabinet made of laminated shutter of 19mm thick BWP with shelves and | | |partitions in balancing laminate, with 6mm thick saint g obain glass cladding above back splash| | |and 100mm high laminated skirting. The rate shall be inclusive of necessary hardware, 140 | | |high D shaped Hetitch handle code no. 011869 lock sets, self closing hinges, spring loaded | | |shutter, latch inside, all cabinet hardware to beâ⬠HETTITCHâ⬠or equivalent complete as per | | |Architects approval.. |5 |WORKING COUNTER:- Providing and fixing in position fixed work counter made of 25mm thick | | |HPL post form laminated top with key board tray and 3 drawer mobile pedestal unit and every | | |1200 length of the work counter over head storage unit and pin up board including all glues, | | |nails, sliding channel, bracket for support fixed to portition, hinges, 140 high D shaped | | |Hetitch handle code no 011869, multipurpose locks, wire manager etc. complete as per design | | |and drawing. | |6 |OVERHEAD STORAGE UNITS: Providing and fixing 350 deep & 600 high Overhead Storage Units at | | |constructed from best quality bwp comm. board shutters to have 1mm thick laminate outside & | | |counter laminated on inside. Internal partitions & shelves also to be laminated.Hardware140mm| | |high D shaped Hetitch handle code no 011869, Lock sets, self-closing hinges, spring loaded | | |shutter latch inside, all cabinet hardware to be of Hetitch make as approved by the Architect. | |à |TOTAL FOR BUILT-IN FURNITURE (RUPEES) | |à |à | |D. |LOOSE FURNITURE | |à |Fabricating supplying and placing in position various types of furniture made of Ist class | | |white beech wood, commercial/BWP ply/ board 4. 0mm thick steam beech veneer, 1. mm thick | | |laminate, brushed steel sheet, internal hardwood framing all necessary hard ware like nails, | | |screws, magnetic catchers, hinges, handles, knobs etc. complete as per design and drawing. | |1 |RECEPTION TABLE SIZE (2400X700X1190high) :- Made of corian panel, corian counter top and | | |laminate on under side of the top and on inner side of the panel, 3 draw er pedestal unit with| | |SS legs 140 high D shaped Hetitch handle code no. 011869 made as as per deign and drawing. | | |(BR of Corian to be taken as Rs 750/sft) | |2 |GUARD TABLE AT LOBBY:- TABLE SIZE (900X600X1000high) Combination of laminated commercial and | | |duco painted MDF in Z shape as per approval. |à |à | |3 |MEETING ROOM CREDENZA:- Fabricating supplying and placing in position meeting room credenza of| | |size 1500x400x750 high made of 32mm thick laminated finished top with PVC edge banding | | |laminate shutter, adjusable shelves, all internal surfaces to be laminated supported on SS | | |base 140 high D shaped Hetitch handle code no. 011869, locks etc complete as per design and | | |drawing | |4 |Providing and fixing of BROCHURE RACK of size 1500 & 100deep at top and 250 dep at bottom | | |made as per design and drawing. No | |5 |COMPANY LOGO:-Providing and fixing company logo (Nokia Siemens Networks) in 8mm thick acrylic | | |sheet pasted with digitally print ed graphic film. Complete as per Architects approval. |6 |PICTOGRAMS (SS Door Signage's): Providing and fixing Stainless Steel Finish pictograms over | | |doors, walls with double solid with 3M tape & images/ letters with silk screen printing | | |technology over all size of pictogram to be 148x147mm (To be got executed by Millennium | | |Business Associates) | |7 |FOLIO (SS Name Plate):- Providing and fixing folio with size of 200x45mm brushed SS sheet | | |stuck to surface with 3M double sided tape, letters in black coloured etching embossing fonts | | |as approved. (To be got executed by Millennium Business Associates) | |8 |FLOOR MATS :- Providing and fixing 3M Brand Nomad mat ââ¬â 7150 poly vinyl coil loop design with | | |vinyl foam backing made as per manufacturers specification. |9 |WHITE BOARD :- Providing and fixing white magnetic board of Alkosign display system (Alkosign | | |) on wall and fixed with all necessary arrangement as per manufacturers specifications etc. | | |complete. | |* |1050Ãâ"1200 | |* |1200 x 1200 | |* |1800 x 1200 | |à |à | |10 |ALUMINIUM/PENCIL TRAY FOR MARKER BOARD:-Providing and fixing aluminium tray below white marker| | |board for keeping accessories. |à |à | |11 |SLOTTED ANGLE RACK:- Fabricating, supplying and placing slotted angle rack of size | | |900wx2100hx600deep made as per manufacturers specification. | |12 |TACK BOARD :- Providing and fixing pin-up board made of 12mm thick cellotex / jelly board | | |fixed with kail wood frame work and 6 mm thick commercial ply backing covered with fabric | | |fixed to wall with screws surrounded with fabric steam beech wood lipping with melamine | | |polishing etc. complete as per design and drawing. (Basic rate of fabric to be taken as Rs. | | |250/meter) | |13 |TV BRACKET :-Providing and fixing TV bracket for wall mounting 29â⬠³ Television set. |14 |TOILET MIRROR:-Providing and fixing 12mm thick tempered float glass pasted with 3M film | | |(crystal qualit y) as approved by the architect and mounted on four numbers 19mm dia brushed SS| | |studs, complete as per design and drawing. | |15 |SS TRASH BIN:-Supplying and placing in position SS trash bin 500 dia and 800 high as per | | |Architects approval. | |16 |DLINE MAKE TOILET ACCESSORIES | |à |Providing and fixing the following fixtures of Dline make SS brushed finish. | |* |Bottle opener (Item code 14. 7071. 02. 000) | |* |SS coat hooks | |* |Toilet paper holder | |à |Soap dispenser (Item code 14. 7045. 02. 002) | |* |Mini Waste paper basket 14. 7097. 02. 000 | |* |Waste paper basket 14. 7085. 02. 201 | |* |Wall mounted paper towel dispenser | |* |Supply of Dline satin stainless steel 316 grade grab bar. 14. 4614. 02. 300 | | |14. 4963. 02. 21 | |17 |TOILET ACCESSORIES | |à |Providing and fixing the following fixtures of Kimberly Clark/ Dream Craft make or equivalent | | |make | |* |Bottle opener | |* |SS coat hooks | |* |Toilet paper holder | |* |Soap dispenser (Kimb erly clark make) | |* |Soap dispenser (BOB BRICK make in brushed finish Code B-4112 26GB) | |* |Mini Waste paper basket (WC) | |* |Waste paper basket | |* |Push Bin (Code SE 4020T) | |* |Wall mounted paper towel dispenser | |* |Providing and fixing grab bar 600mm c. p. wall flange at end of bars with heavy duty anchor | | |fastner & accessories. (FOR HANDICAP TOILETS ONLY). |18 |FLOOR DIRECTORY: Providing and fixing wall mounted floor directory with slk screen printing | | |text of approved colour and consisting of the following plates | |* |1) 1 Nos, 4mm thick aluminum plates painted in dark Grey in colour of over all size 300x55mm. | |* |2) 8Nos, SS 316 grade plates of 2mm thick with over all size 300x30mm. | |19 |TRANSITION PROFILE:- P/F transiction profile of SS L-section 6mm thk between two different | | |flooring materials | |20 |URINAL PARTITION:-Providing and fixing of urinal partition in 12mm thick toughened glass with | | |frosted film fixed with SS bracket as per desig n and drawing. |21 |Wash basin with water sancer | |22 |American satndard WC | |23 |Plumbing & sanitary work | |24 |SOFA in reception area (images of proposed sofa to be submitted along with the quote) | |25 |Sofa chairs for pantry / breakout (images of proposed sofa chairs to be submitted along with | | |the quote) | |26 |Tables for pantry / breakout (images of proposed sofa chairs to be submitted along with the | | |quote) | |27 |Tables for reception sofa (images of proposed sofa chairs to be submitted along with the | | |quote) | |à |TOTAL FOR LOOSE FURNITURE (RUPEES) | |à |à | |E. |FINISHES | |1 |PLASTIC EMULSION PAINT (ICI Dulux make) on walls and gypboard/POP ceiling including surface | | |preparation, primer coats, leveling patti and minimum 3 coats of brush and roller finish. | |2 |PASTEL COLOUR:- Extra over Item No-1 of plastic emulsion paint but for pastel colour. | |3 |OIL BOUND DISTEMPER (O. B. D) :- Providing and applying O. B.D paint of desired colour finish or| | |equal including necessary base work, preparatory work. | |4 |PROVIDING AND FIXING SILICONE SEALANT around all toilet fixtures including urinals, WCs & wash| | |basins etc. | |5 |TEXTURE PAINT:-providing and applying texture paint on wall of approved brand and manufacturer| | |after scrapping, having the existing finish and applying primer coat. | |6 |ARMOUR COAT PAINT:- Providing and applying polished platser of Armourcoat or equivalent as of | | |approved colour on wall/ Ply surface including surface preparation primer coat as per | | |manufacturers specification. BR to be taken as Rs 160/sft) | |F. |SUPPORT SERVICES | |1 |Support services to modular furniture, Carpet vendor, chair supplier, and other furniture | | |suppliers including taking delivery of consignments brought to site,safe storage, removing | | |wrapping, moving and placing them at proper locations prior to final hand over. Coordination | | |and assistance to fire detection / supression and security systems vendor for their scope of | | |work | |G. Sprinkler works (including testing and commisioning) | |à |C. I butterfly valve of approved make,with nuts, bolts, gaskets, flanges, coupler etc. complete| | |as specified. | |à |Flap Type Non Return Valve | |à |G I. ââ¬ËC' Class pipes as per IS 1239 with Flanged , Screwed or welded joints with necessary | | |Specials, clamped to wall, beams or ceilings as per specifications with approved anchor | | |fastners; MS brackets,testing to 13. 5 Kg/Sq. cm hydraulic pressure after installation, and | | painting two coats of enamel paint of approved colour over two coats of primer. | |à |Conventional Sprinkler (pendant / upright) quartzoid bulb type with 15mm screwed end | | |connection of 68 deg. C. temperature rating,K 80 and orifice shall not be less than | | |6mm. Sprinklers shall be UL Listed / FM approved with Chrome finished. | |à |Rosette plate (Recessed type, in two piece) for Sprinklers below false ceiling area. ) Same | | |should be fabricated by M. S. plate of 2mm thick and the finish shall be powder coated and | | |color shall be as approved by architects / clients. | SPECIFICATION FOR CARPET | | | |SN |DESCRIPTION | |à |SUPPLY & LAYING OF CARPET AS PER THE FOLLOWING SPECIFICATION | |à |à | |à |Threads | |à |à | |à |Specifications | |à |à | |1 |Fibre ââ¬â 100% Nylon | |à |à | |2 |Yarn weight ââ¬â 20 oz | |à |à | |3 |Backing ââ¬â Non PVC | |à |à | |4 |Density ââ¬â Greater than 4500 | |à |à | |5 |Gauge ââ¬â 1/10 | |à |à | |à |Make : Shaw / interface / Milliken / Tandus / Bonar floor | | |Specifications- MEP WORKS | |Sr. No |Particulars | |à |SUMMARY | |A |M. V. SWITCHGEAR | |B |M
Subscribe to:
Posts (Atom)